Permit Application Status

PRBD201900567


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201900567
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
01/17/2019
01/17/2019
07/16/2019
11/06/2019

Locations

Permits

Permit Number: PRBD201900567

Building
Finaled
01/17/2019
07/16/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 01/17/2019
Corrections:


Miscellaneous/Other
Comment Only
01/17/2019
Wall framing for the prep area approved. See permit for 339 south for other inspections that pertain to this buildout. Firestops are completed from below floor and still to be viewed.

Miscellaneous/Other
Carried Forward
01/17/2019
Firestops to still be viewed from the UGG storage space below the prep kitchen.

Building Final Inspection Not Ready 11/4/2019 (12:30 - 2:30) 11/4/2019 (PM) 11/04/2019
Corrections:


Miscellaneous/Other
Comment Only
11/04/2019
1) firestops at cooridor to be completed. 2) above ceiling inspection to be completed, have ladder and open tiles at ceiling for inspection. 3) install smoke seal at rear door, including at locked leaf. 4) caulk around the two stainless steel patches under and behind hand wash sink.

Progress Inspection Not Ready 11/04/2019
Corrections:


Miscellaneous/Other
Carried Forward
11/05/2019
Rectangle duct on 3rd floor in back of house cooridor needs protection built around the duct, not to impede on the minimum clearance width of cooridor. Through roof of duct needs to be firestopped and fireproofing to be patched to match exist for the roof rating.

Fire Inspection Final Passed w/ Conditions 11/4/2019 (12:30 - 2:30) 11/4/2019 (PM) 11/05/2019
Corrections:


Fire extinguisher(s) needed.
Comment Only
11/05/2019
Fire extinguisher(s) needed. Hang 10 pound dry chemical fire extinguisher by exit door.

Framing Inspection Partial Pass 11/05/2019
Corrections:


Miscellaneous/Other
Carried Forward
11/05/2019
Firestops to still be viewed from the UGG storage space below the prep kitchen.

Miscellaneous/Other
Comment Only
11/05/2019
Above ceiling and firestops approved. Verbal Correction: close up the open junction box located at back of house wall. Completed surround and firestop / fireproofing at duct to be checked at next inspection, along with the firestops in floor located in the UGG space.

Progress Inspection Partial Pass 11/05/2019
Corrections:


Miscellaneous/Other
Carried Forward
11/05/2019
Rectangle duct on 3rd floor in back of house cooridor needs protection built around the duct, not to impede on the minimum clearance width of cooridor. Through roof of duct needs to be firestopped and fireproofing to be patched to match exist for the roof rating.

Miscellaneous/Other
Comment Only
11/05/2019
Approved to bring in small wares.

Building Final Inspection Passed 11/06/2019
Corrections:


Miscellaneous/Other
Comment Only
11/06/2019
Viewed the firestops located in the UGG space that are for the plumbing of this kitchen...approved . Viewed the firestop and fireproofing patching around the duct through the roof, and the protection build around the through floor duct... approved. Water is turned on in the prep kitchen and all corrections are now completed. As per all trades inspections and building inspections being completed in this space and EH approval , this kitchen is ready for use. Approved for the owners to bring in product and use this space. Final for this permit only is approved.