PRBD201901049
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Footing Inspection | Partial Pass | 6/28/2019 (8:00 - 10:00) | 6/28/2019 (AM) | 06/28/2019 |
Footing Inspection | Partial Pass | 7/23/2019 (8:00 - 10:00) | 7/23/2019 (AM) | 07/23/2019 |
Lath Inspection | Partial Pass | 1/13/2020 (10:00 - 12:00) | 1/13/2020 (AM) | 01/13/2020 |
Framing Inspection | Partial Pass | 1/27/2020 (8:00 - 10:00) | 1/27/2020 (AM) | 01/27/2020 |
Progress Inspection | Passed | 2/10/2020 (8:00 - 10:00) | 2/10/2020 (AM) | 02/10/2020 |
Miscellaneous/Other
Comment Only
02/10/2020
Discussed requirements for sprinkler and soffit/lid for equivalency for glass enclosure around elevator.
Also discussed the need for life safety final inspection prior to allowing for stock and/or staff training.
Request knox box and keyed access on all rear (north side) stairwell exit discharge door.
General Contractor to also follow up on fire alarm/sprinkler monitoring installation and permit.
|
||||
Building Final Inspection | Partial Pass | 02/10/2020 | ||
Miscellaneous/Other
Carried Forward
02/10/2020
Temp Final - to stock product.
A. Final fire sprinkler, with exit signage and additional EM lighting,( see comment *C. below) through out ALL all areas of the store.
B. Provide a NO PARKING sign at ( the head of all accessible parking unload spaces.) upon final only.
C. All Exit signage to have Emergency lighting, and Additional Emergency lighting throughout all spaces as required to provide a minimum of 1 foot candle of illumination through out all areas of the building, for a loss of power situation.
D. Final fire sprinkler, ( see comment C above ) exit signage, emergency lighting, required to bring in product to stock store.
E. Elevator final required for each elevator before using elevator.
F. HVAC - Seal to concrete floor deck and ductwork, with 1 hr rated system, all bottom openings of all mechanical shafts.
G. ALL SPECIAL INSPECTION summary reports e mailed to Bpost@bloomingtonmn.gov
H. All stairwells having handrails-guard rails with self closing rated doors, with smoke gaskets.
I. All open stairways must be completed prior to using.
|
||||
Fire Inspection Final | Partial Pass | 04/06/2020 | ||
Miscellaneous/Other
Comment Only
04/06/2020
Partial final approved for stock and staff only.
|
||||
Building Final Inspection | Issue CO | 07/20/2020 | ||
Miscellaneous/Other
Outstanding
02/10/2020
Temp Final - to stock product.
A. Final fire sprinkler, with exit signage and additional EM lighting,( see comment *C. below) through out ALL all areas of the store.
B. Provide a NO PARKING sign at ( the head of all accessible parking unload spaces.)
* C. All Exit signage to have Emergency lighting, and Additional Emergency lighting throughout all spaces as required to provide a minimum of 1 foot candle of illumination through out all areas of the building, for a loss of power situation.
D. Final fire sprinkler, ( see comment C above ) exit signage, emergency lighting, required to bring in product to stock store.
E. Elevator final required for each elevator before using elevator.
F. HVAC - Seal to concrete floor deck and ductwork, with 1 hr rated system, all bottom openings of all mechanical shafts.
G. ALL SPECIAL INSPECTION summary reports e mailed to Bpost@bloomingtonmn.gov
|