PRBD201901174
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Partial Pass | 6/27/2019 (10:00 - 12:00) | 6/27/2019 (AM) | 06/27/2019 |
Fire Inspection Final | Passed | 9/27/2019 (10:00 - 12:00) | 9/27/2019 (AM) | 09/27/2019 |
Building Final Inspection | Not Ready | 9/27/2019 (10:00 - 12:00) | 9/27/2019 (AM) | 09/27/2019 |
Miscellaneous/Other
Carried Forward
09/27/2019
Final walk thru. A. Need to provide 48 inch clear distance in front of the elongated toilet, in one of the 2 restrooms. B. Two restrooms provided.
C. One restroom has 42 inch in front of the toilet, and one restroom may only need to be accessible.
D. Consider a different brand of toilet with different back of wall off set, and shorter style elongated toilet length.
|
||||
Building Final Inspection | Passed | 11/01/2019 | ||
Miscellaneous/Other
Outstanding
09/27/2019
Final walk thru. A. Need to provide 48 inch clear distance in front of the elongated toilet, in one of the 2 restrooms. B. Two restrooms provided.
C. One restroom has 42 inch in front of the toilet, and one restroom may only need to be accessible.
D. Consider a different brand of toilet with different back of wall off set, and shorter style elongated toilet length.
|
||||
Building Final Inspection | VOID | 11/01/2019 |