Summary

PRBD201901583
Building
Finaled
G&I VIII WF PLAZA LLC
Alteration/Repair/Replace
Business
Tenant Improvements for New Tenant
02/25/2019
03/04/2019
10/30/2019
02/07/2020

Locations

Permits

Permit Number: PRBD201901583

Building
Finaled
03/04/2019
10/30/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Fire Rated Assemblies Inspection Partial Pass 03/14/2019
Scrim perimiter above ceiling - OK.. A. PATCH FIREPROOFING IN 2 PLACES, PATCH GYPSUM BOTH SIDES OF CORRIDOR ABOVE CEILING. CALL FOR REINSPECTION. B. Call for plumbing rough in - wall area againsst 1 hr corridor. Also Call for above ceiling for fire alarm wiring, electrical, fireproofing, HVAC, Firesprinkler, and building inspection. Permit Card on site.
Framing Inspection Partial Pass 3/14/2019 (10:00 - 12:00) 3/14/2019 (AM) 03/14/2019
Walls to deck for sound reduction. Call for above ceiling inspections for all trades - see permit card on site.
Fire Rated Assemblies Inspection Not Ready 4/9/2019 (8:00 - 10:00) 4/9/2019 (AM) 04/09/2019
1 hour exit corridor adjoining 1 hr elevator lobby.
Corrections:


Miscellaneous/Other
Carried Forward
04/09/2019
A. 1 hr exit corridor wall adjoins existing 1 hr elevator lobby. Corrections at North End of corridor, as follows. 1. Must provide sheetrock both sides at open areas above ceiling viewed from interior of space. 2. Also need to view above ceiling the exterior corridor side, as ceiling tiles have been installed. 3. Need separate permit for exterior corridor VAV above ceiling work, that requires a smoke fire damper, wired into the fire alarm, not a fire damper. 4. Reviewed exit signage and adding emergency lighting wall pack with electrical contractor on site. 5. Patch fireproofing on existing steel beams - approved. 6. 45 Minute Smoke rated exit doors and gaskets w closers upon final.

Fire Inspection Final Issue TCO 5/3/2019 (8:00 - 10:00) 5/3/2019 (AM) 05/03/2019
2 week tco
Building Final Inspection Issue TCO 5/3/2019 (8:00 - 10:00) 5/3/2019 (AM) 05/03/2019
Need firelight glass on entry doors, and mag lock release on entry exit doors.
Corrections:


Miscellaneous/Other
Carried Forward
05/03/2019
Need firelight glass on entry doors. 30 DAYS. Need mag lock release on entry/exit to suite, per fire marshal.

Framing Inspection VOID 02/07/2020
Fire Rated Assemblies Inspection VOID 02/07/2020
Corrections:


Miscellaneous/Other
Outstanding
04/09/2019
A. 1 hr exit corridor wall adjoins existing 1 hr elevator lobby. Corrections at North End of corridor, as follows. 1. Must provide sheetrock both sides at open areas above ceiling viewed from interior of space. 2. Also need to view above ceiling the exterior corridor side, as ceiling tiles have been installed. 3. Need separate permit for exterior corridor VAV above ceiling work, that requires a smoke fire damper, wired into the fire alarm, not a fire damper. 4. Reviewed exit signage and adding emergency lighting wall pack with electrical contractor on site. 5. Patch fireproofing on existing steel beams - approved.

Fire Rated Assemblies Inspection VOID 02/07/2020
Fire Inspection Final VOID 02/07/2020
Building Final Inspection VOID 02/07/2020
Corrections:


Miscellaneous/Other
Outstanding
05/03/2019
Need firelight glass on entry doors. 30 DAYS. Need mag lock release on entry/exit to suite, per fire marshal.