Summary

PRBD201901664
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
Remodel for New Dragon Acupressure
02/27/2019
04/26/2019
12/24/2019
06/27/2019

Locations

Permits

Permit Number: PRBD201901664

Building
Finaled
04/26/2019
12/24/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Failed 5/14/2019 (8:00 - 10:00) 5/14/2019 (AM) 05/14/2019
Cancellation by contractor for today's inspection at 8:49. jsmidt 05/14/2019 8:50 AM
Corrections:


Miscellaneous/Other
Comment Only
05/14/2019
Inspection canceled and suite locked up.

Framing Inspection Partial Pass 5/16/2019 (2:30 - 3:30) 5/16/2019 (PM) 05/16/2019
Corrections:


Miscellaneous/Other
Comment Only
05/16/2019
Wall framing approved and ok to close up. Above Ceiling : 1) patch at mall bulkhead and at Bach of house cooridor wall. 2) install access panel at front corner of main entrance to store. Above ceiling inspection needed along with sprinkler inspection.

Framing Inspection Passed 5/21/2019 (8:00 - 10:00) 5/21/2019 (AM) 05/21/2019
Corrections:


Miscellaneous/Other
Comment Only
05/21/2019
Above ceiling approved, ok to cover.

Miscellaneous/Other
Outstanding
05/21/2019
Access panel in the inside corner at storefront needed, check at final.

Fire Inspection Final Passed 6/27/2019 (12:30 - 2:30) 6/27/2019 (PM) 06/27/2019
Building Final Inspection Passed 6/27/2019 (12:30 - 2:30) 6/27/2019 (PM) 06/27/2019
Corrections:


Miscellaneous/Other
Comment Only
06/27/2019
Final approved, ok to open to public.