PRBD201901742
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Footing Inspection | Partial Pass | 6/13/2019 (12:30 - 2:30) | 6/13/2019 (PM) | 06/13/2019 |
Corrections:
Miscellaneous/Other
Comment Only
06/13/2019
Footings with pier pads at exterior perimeter of structure... from lines 1-5, line S-J.
Approved for concrete placement.
|
||||
Footing Inspection | Partial Pass | 6/14/2019 (12:30 - 2:30) | 6/14/2019 (PM) | 06/14/2019 |
Corrections:
Miscellaneous/Other
Comment Only
06/14/2019
Footings with rebar and mats for piers at perimeter.... lines A to J, and lines 1 to 4 ... including stair tower wall footing just past line 4.
|
||||
Footing Inspection | Not Ready | 6/17/2019 (12:30 - 2:30) | 6/17/2019 (PM) | 06/17/2019 |
Corrections:
Miscellaneous/Other
Comment Only
06/17/2019
Not ready for inspections.
|
||||
Footing Inspection | Partial Pass | 6/18/2019 (12:30 - 2:30) | 6/18/2019 (PM) | 06/18/2019 |
Corrections:
Miscellaneous/Other
Comment Only
06/18/2019
Poured walls from grid line 1 to 5from R to T. Line 2 from R to L.
Footings on lines 4 including elevator pit.
Approved for concrete placement.
|
||||
Footing Inspection | Passed | 07/02/2019 | ||
Corrections:
Miscellaneous/Other
Comment Only
07/02/2019
8 interior column pad footings and rebar.. approved for concrete placement.
|
||||
Framing Inspection | Partial Pass | 9/18/2019 (8:00 - 10:00) | 9/18/2019 (AM) | 09/18/2019 |
Main floor: SOUTH WEST: A. Steel stud wall framing. | ||||
Insulation Inspection | Partial Pass | 9/18/2019 (8:00 - 10:00) | 9/18/2019 (AM) | 09/18/2019 |
WEST SIDE; A. Slab on garage poly. Insulation to follow with in floor radiant heat tube. | ||||
Framing Inspection | Partial Pass | 10/8/2019 (12:30 - 2:30) | 10/8/2019 (PM) | 10/08/2019 |
Corrections:
Miscellaneous/Other
Comment Only
10/08/2019
Partial framing .... 2 exterior sections and partial parapet on 2nd floor of west side of building. Approved
|
||||
Footing Inspection | Partial Pass | 10/15/2019 (2:30 - 3:30) | 10/15/2019 (PM) | 10/15/2019 |
Corrections:
Miscellaneous/Other
Comment Only
10/15/2019
Rebar for a pad footing, elevator top cap, and for the section of slab on grade in west building...approved
|
||||
Progress Inspection | Partial Pass | 10/31/2019 (12:30 - 2:30) | 10/31/2019 (PM) | 10/31/2019 |
Corrections:
Miscellaneous/Other
Comment Only
10/31/2019
Progress of roofing installation, this inspection was of the secondary flashing installed prior to the roof insulation and covering is installed. This flashing is proprietary to the roofing system and per the installation requirements.
|
||||
Framing Inspection | Partial Pass | 11/26/2019 (12:30 - 2:30) | 11/26/2019 (PM) | 11/26/2019 |
Corrections:
Miscellaneous/Other
Comment Only
11/26/2019
Interior framing of walls on 2nd floor not including the bathrooms... approved
Exterior wall framing on 2nd level ...approved.
|
||||
Progress Inspection | Partial Pass | 12/16/2019 (10:00 - 12:00) | 12/16/2019 (AM) | 12/16/2019 |
Corrections:
Miscellaneous/Other
Comment Only
12/16/2019
Slab on grade poly for east apparatus bay...approved. Call for inspection of rebar and piping when installed and ready to pour slab.
|
||||
Progress Inspection | Partial Pass | 12/17/2019 (12:30 - 2:30) | 12/17/2019 (PM) | 12/17/2019 |
Progress Inspection | Partial Pass | 12/17/2019 | ||
Corrections:
Miscellaneous/Other
Comment Only
12/17/2019
Underslab poly in the center stall bay approved. Call for the in floor heat and rebar inspection when ready.
|
||||
Progress Inspection | Partial Pass | 12/26/2019 (12:30 - 2:30) | 12/26/2019 (PM) | 12/26/2019 |
Corrections:
Miscellaneous/Other
Comment Only
12/26/2019
Viewed the spray foamed areas of the roof details of the upper sections of steel framing...approved
rebar installation at east vehicle bays approved, pending the installation of chairs to raise bars off the woorsbo piping. Contractor has chairs cut to size so they can lift mats and place the chairs.
|
||||
Progress Inspection | Partial Pass | 12/27/2019 (12:30 - 2:30) | 12/27/2019 (PM) | 12/27/2019 |
Corrections:
Miscellaneous/Other
Comment Only
12/27/2019
Progress of in floor rebar approved and ongoing. To be rechecked at next inspection.
Consultation with architect, city, and contractor about adding stalls at the men’s urinals for privacy due to the field of view when door to bathroom is opened. Architect to run designs and numbers to make sure accessibility is met with doing so.
|
||||
Progress Inspection | Partial Pass | 12/30/2019 (12:30 - 2:30) | 12/30/2019 (PM) | 12/30/2019 |
Corrections:
Miscellaneous/Other
Comment Only
12/30/2019
Rebar mats in west apparatus bays approved... approved for concrete placement
|
||||
Lighting Inspection | Passed | 01/07/2020 | ||
Progress Inspection | Partial Pass | 2/11/2020 (8:00 - 10:00) | 2/11/2020 (AM) | 02/11/2020 |
Corrections:
Miscellaneous/Other
Comment Only
02/11/2020
Partial view of ceiling framing on second level. Trades inspections needed prior to building inspection... call to set up inspection.
Went over handrails in the stairwell of the hose tower. Clearance for the railing cannot be achieved at the column steel locations. Contractor to contractor can address this issue by installation of an added handrail from top to bottom of the stair flight at the problematic areas. This is still a pending issue and to be discussed amongst the design team for approval.
|
||||
Progress Inspection | Partial Pass | 2/24/2020 (10:00 - 12:00) | 2/24/2020 (AM) | 02/24/2020 |
Corrections:
Miscellaneous/Other
Comment Only
02/24/2020
Framing and above ceiling of 2nd floor hard lid area... approved
|
||||
Above Ceiling Inspection | Partial Pass | 3/17/2020 (12:30 - 2:30) | 3/17/2020 (PM) | 03/17/2020 |
Corrections:
Miscellaneous/Other
Comment Only
03/17/2020
Approved to pad out ceiling areas not needing draftstopping at floor penetrations. See outstanding comments for corrections.
|
||||
Miscellaneous/Other
Carried Forward
04/02/2020
1) floor penetrations need to be draftstopped.
2) 2nd floor walls to the shaft need to be continued to the roof and firestops at penetrations.
3) complete firestops at rated walls of dorm rooms and hallway wall. Walls get firestops at both sides.
|
||||
Above Ceiling Inspection | Partial Pass | 04/02/2020 | ||
Corrections:
Miscellaneous/Other
Comment Only
04/02/2020
Viewed the floor infill framing closure at ducting and piping runs , at opening in the lower level meeting room... partial approval, and pending the completion of sealing around the pipes for a smoke and gas seal... see outstanding comments.
|
||||
Miscellaneous/Other
Outstanding
04/02/2020
The floor opening and piping at the through floor ducting and piping runs that go to the second level behind laundry and bathrooms need to be sealed for smoke and gas. Complete this for next inspection.
|
||||
Progress Inspection | Partial Pass | 4/22/2020 (Morning) | 4/22/2020 (AM) | 04/22/2020 |
Corrections:
Miscellaneous/Other
Comment Only
04/22/2020
Concrete aprons with structural foam and rebar as per plans at back side of building and garage doors... approved for concrete placement
|
||||
Progress Inspection | Partial Pass | 04/23/2020 | ||
Corrections:
Miscellaneous/Other
Comment Only
04/23/2020
Viewed the front of building reinforced apron slabs with the structural foam underneath. Approved for concrete placement
|
||||
Progress Inspection | Partial Pass | 05/19/2020 | ||
Corrections:
Miscellaneous/Other
Comment Only
05/19/2020
Viewed rebar for trench drain... installed as per plan design.
Questions for EM lighting... determined the hose stairway is not part of an egress route or exiting and does not fall into the required locations for Emergency lighting to be required as per 2015 IBC code section 1006.
|
||||
Progress Inspection | Partial Pass | 06/11/2020 | ||
Corrections:
Miscellaneous/Other
Comment Only
06/11/2020
Went over with contractor the locations where firestops are still needed. Will inspect at next inspection
|
||||
Progress Inspection | Passed w/ Conditions | 7/22/2020 (8:00 - 10:00) | 7/22/2020 (AM) | 07/22/2020 |
952-292-5296 | ||||
Corrections:
Miscellaneous/Other
Outstanding
07/22/2020
1) install occupancy load signage as per code plan in training room.
2) install accessibility signage at the Handicapped parking stalls.
3) elevator final needed.
4) install address numbers to building.
|
||||
Miscellaneous/Other
Comment Only
07/22/2020
Approved for temp occupancy.
See “outstanding comments “ for corrections and set up final inspection when completed.
|
||||
Miscellaneous/Other
Comment Only
07/22/2020
Approved for temp occupancy.
See “outstanding comments “ for corrections and set up final inspection when completed.
|
||||
Progress Inspection | Passed w/ Conditions | 07/22/2020 | ||
Corrections:
Miscellaneous/Other
Outstanding
07/22/2020
1) install occupancy load signage as per code plans for the training room.
2) install accessibility signage at parking stalls.
3) complete elevator elevator inspection and final with the state.
4) install address numbers to the building.
|
||||
Miscellaneous/Other
Comment Only
07/22/2020
Approved for temp occupancy .
All open trades permits are being checked over by the respective inspectors to close them out.
See outstanding comments for corrections, call for final inspection when all is completed.
|
||||
Fire Inspection Final | Passed | 8/11/2020 (12:30 - 2:30) | 8/11/2020 (PM) | 08/11/2020 |
Building Final Inspection | Failed | 8/11/2020 (12:30 - 2:30) | 8/11/2020 (PM) | 08/11/2020 |
Corrections:
Miscellaneous/Other
Carried Forward
08/11/2020
1) install occupancy signage to assembly room.
2) accessibility parking signs are 2ft beyond the max measured distance to where they can be located and the signs are too low in height as what the code requires.
|
||||
Building Final Inspection | Passed | 8/14/2020 (8:00 - 10:00) | 8/14/2020 (AM) | 08/14/2020 |
Corrections:
Miscellaneous/Other
Resolved
08/14/2020
1) install occupancy signage to assembly room.
2) accessibility parking signs are 2ft beyond the max measured distance to where they can be located and the signs are too low in height as what the code requires.
|
||||
Miscellaneous/Other
Comment Only
08/14/2020
Parking stall signage corrected and meet accessibility code.
Occupancy sign installation approved.
Final for this permit approved to give full occupancy.
|