Summary

PRBD201901852
Building
Finaled
G&I VIII WF PLAZA LLC
Alteration/Repair/Replace
Business
Tenant Improvement
03/05/2019
03/26/2019
01/27/2020

Locations

Permits

Permit Number: PRBD201901852

Building
Finaled
03/26/2019
01/27/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 4/1/2019 (2:30 - 3:30) 4/1/2019 (PM) 04/01/2019
progress inspection.
Framing Inspection Partial Pass 4/1/2019 (2:30 - 3:30) 4/1/2019 (PM) 04/01/2019
floor 21. Build out of existing north west vacancy for existing tenant Total Dynamics. A. Patch fireproofing on existing steel beams. B. Scrim foil protection above windows to concrete floor above. C. Rated 1 hr corridor requiring smoke fire dampers and 1 hour walls to deck above. D. Remove ceiling tiles to view existing above ceiling conditions, and call for reinspection.
Progress Inspection Passed 4/12/2019 (8:00 - 10:00) 4/12/2019 (AM) 04/12/2019
Need fire sprinkler and horn strobe above ceiling WORK AND inspection, by LSS COMPANY. A. Verbal order to install 90 minute wall packs through out, for loss of power EM lighting BY Extreme Electric. B. Patch fireproofing , and exterior rim scrim foil protection- approved. C. Need HVAC permit for all above ceiling new work if applicable. D. Design has ceiling tile, for complete plenum return air, from building floor main return air duct opening, approved.
Building Final Inspection Issue TCO 5/9/2019 (10:00 - 12:00) 5/9/2019 (AM) 05/09/2019
Corrections:


Miscellaneous/Other
Comment Only
05/09/2019
BUILDING Temp C O - APPROVED. A. ALL TRADE INSPECTIONS HAVE ISSUED TEMP C O . OFFICE FURNITURE IS BACKORDERED,.

Building Final Inspection Passed 7/11/2019 (2:30 - 3:30) 7/11/2019 (PM) 07/11/2019
Corrections:


Miscellaneous/Other
Outstanding
07/11/2019
Final - approved. Outstanding issues. A. Provide smoke gaskets to the two metal doors exiting into the rated corridor. B. Complete ceiling tiles for furniture feeds running thru ceiling tiles into the plenum ceiling above.

Fire Inspection Final Passed 7/11/2019 (2:30 - 3:30) 7/11/2019 (PM) 07/31/2019
Fire Inspection Final Passed 7/31/2019 (12:30 - 2:30) 7/31/2019 (PM) 07/31/2019