Permit Application Status

PRBD201902061


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201902061
Building
Finaled
8800 QUEEN LLC
Alteration/Repair/Replace
Not Required
Interior remodel of office space
03/11/2019
04/22/2019
12/30/2019

Locations

Permits

Permit Number: PRBD201902061

Building
Finaled
04/22/2019
12/30/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Building Final Inspection Pending
Corrections:


Miscellaneous/Other
Outstanding
07/03/2019
Temp CO only. Items to be completed in 35 days. A. Move one exit sign due to modified furniture plan. Install 3 fire extinguishers. B. Signage must be provided outside of the main floor AND second floor area of refuge stairway, identifying the specific stairway for the emergency call box information communicating to emergency responders the location of rescue for handicapped persons waiting inside this stairway. Stairwell identification- Example- next to the doorway entrance into the stairway leading into the new second floor office at main floor and second floor. C. This stairway location must be defined as,,,( stairway 2 from main floor security desk area located at south east main building entrance, leading to second floor office area,) and this voice message must be recorded in the area of refuge emergency call box information located on second floor area of refuge the top level of this fire alarm. D. Area of refuge signage and call box and instructions must be located inside the 2nd level stairway.

Framing Inspection Partial Pass 5/16/2019 (10:00 - 12:00) 5/16/2019 (AM) 05/17/2019
Corrections:


Miscellaneous/Other
Carried Forward
05/17/2019
Framing - partial passed. A. Area of refuge call station to be wired into building fire alarm. B. Emergency lighting on 90 minute battery power. C. Exit signage for identifying the 3 stairwell exits. D. Area of refuge signage per MN State 2015 IBC CODE and 2015 Accessibility CODE. E. STRUCTURAL STEEL BEAM AND STEEL I beam columns for two story portion of building. See IBC FOR 2 STORY VS GREATER THAN 2 STORY CONSTRUCTION STRUCTURAL ELEMENT PROTECTION.

Fire Inspection Final Passed 7/3/2019 (12:30 - 2:30) 7/3/2019 (PM) 07/03/2019
Building Final Inspection Issue TCO 7/3/2019 (12:30 - 2:30) 7/3/2019 (PM) 07/03/2019
See corrections.
Corrections:


Miscellaneous/Other
Carried Forward
07/03/2019
Temp CO only. Items to be completed in 35 days. A. Move one exit sign due to modified furniture plan. Install 3 fire extinguishers. B. Signage must be provided outside of the main floor AND second floor area of refuge stairway, identifying the specific stairway for the emergency call box information communicating to emergency responders the location of rescue for handicapped persons waiting inside this stairway. Stairwell identification- Example- next to the doorway entrance into the stairway leading into the new second floor office at main floor and second floor. C. This stairway location must be defined as,,,( stairway 2 from main floor security desk area located at south east main building entrance, leading to second floor office area,) and this voice message must be recorded in the area of refuge emergency call box information located on second floor area of refuge the top level of this fire alarm. D. Area of refuge signage and call box and instructions must be located inside the 2nd level stairway.