PRBD201902179
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Failed | 4/4/2019 (8:00 - 10:00) | 4/4/2019 (AM) | 04/04/2019 |
Corrections:
Miscellaneous/Other
Carried Forward
04/04/2019
Patch fireproofing on overhead steel as required. Need electrical rough in approval. Call for reinspection.
|
||||
Framing Inspection | Passed | 4/12/2019 (12:30 - 2:30) | 4/12/2019 (PM) | 04/12/2019 |
Corrections:
Miscellaneous/Other
Resolved
04/12/2019
Patch fireproofing on overhead steel as required. Need electrical rough in approval. Call for reinspection.
|
||||
Fire Inspection Final | Passed | 05/03/2019 | ||
Building Final Inspection | Passed | 05/20/2019 |