PRBD201902249
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Fire Inspection Final | Passed | 5/29/2019 (10:00 - 12:00) | 5/29/2019 (AM) | 05/29/2019 |
| Fire Rated Assemblies Inspection | Passed | 05/29/2019 | ||
| 1st floor precast floor penetrations to parking ramp below. 2 hr system required. A. From first floor, open holes require minimum 2 inch of packed mineral wool, and then minimum depth of 5/8 inch of 2-4 hour rated intumescent fire caulk. B. Open holes containing (cast iron, copper, or steel piping) require firecaulk filled at perimiter with a minimum finish-surface crown bead of 1/2 inch. C. Approved for top side of precast plank. | ||||
| Framing Inspection | Passed | 4/10/2019 (2:30 - 3:30) | 4/10/2019 (PM) | 05/29/2019 |
| Firecaulk all penetration holes in floor to parking ramp - precast plank. Call for reinspection. Keep one penetration in wall open, all other framing has been approved, for installing drywall. Note accessible sink. | ||||
| Framing Inspection | Passed | 05/29/2019 | ||
| Fire Rated Assemblies Inspection | Passed | 05/29/2019 | ||
| Building Final Inspection | Passed | 5/29/2019 (10:00 - 12:00) | 5/29/2019 (AM) | 05/29/2019 |
| Final - passed. Tempered glass - yes. Trade inspections - passed. Final approved. | ||||