Summary

PRBD201902314
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Mercantile
TENANT IMPROVEMENT OF EXISTING LEASED SPACE FOR A NEW RETAIL STORE. WORK INCLUDES, NON-STRUCTURAL PARTITIONS, CEILINGS, FINISHES, FURNITURE, AND RELATED HVAC,ELECTRICAL, AND PLUMBING WORK.
03/19/2019
04/22/2019
06/07/2020

Locations

Permits

Permit Number: PRBD201902314

Building
Finaled
04/22/2019
06/07/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 6/25/2019 (8:00 - 10:00) 6/25/2019 (AM) 06/25/2019
Corrections:


Miscellaneous/Other
Comment Only
06/25/2019
Approved to cover all walls... pending plumbing inspection at plumbing walls these walls can also be covered.

Framing Inspection Failed 8/5/2019 (12:30 - 2:30) 8/5/2019 (PM) 08/05/2019
Corrections:


Miscellaneous/Other
Comment Only
08/05/2019
Fireproofing patches viewed in sales area at beams and columns needs to meet the same depth as what is already on the beams and columns that Braun had already inspected and tested. Pack all to full depth and call for another inspection.

Framing Inspection Partial Pass 08/07/2019
Corrections:


Miscellaneous/Other
Comment Only
08/07/2019
Patched fireproofing approved

Progress Inspection Partial Pass 9/3/2019 (12:30 - 2:30) 9/3/2019 (PM) 09/03/2019
Corrections:


Miscellaneous/Other
Comment Only
09/03/2019
Above ceiling approved.

Miscellaneous/Other
Carried Forward
09/03/2019
1)Exit sign needed at storefront and a directional at opening of exitway to back of house. 2) the column that is in the walkway in the storage area needs to be sprayed to the minimum thickness of 1 5/8” and the upper face side of column in front of cabinets needs material added to maintain the thickness. To be rechecked prior to covering columns. 3) columns in the enclosed walkway and the two in the storage area need column protection.

Temporary Certificate of Occupancy Inspection Not Ready 9/12/2019 (12:30 - 2:30) 9/12/2019 (PM) 09/12/2019
SEE PENDING ITEMS REQUIRED PRIOR TO FINAL, FOR CORRECTION PER JON AARON. 9/12/2019 PER KRIS KAISER - NOT READY, NEED TESTING ON SMOKE EVACUATION SYSTEM,
Corrections:


Miscellaneous/Other
Carried Forward
09/12/2019
1)Exit sign needed at storefront and a directional at opening of exitway to back of house. 2) the column that is in the walkway in the storage area needs to be sprayed to the minimum thickness of 1 5/8” and the upper face side of column in front of cabinets needs material added to maintain the thickness. To be rechecked prior to covering columns. 3) columns in the enclosed walkway and the two in the storage area need column protection.

Temporary Certificate of Occupancy Inspection Partial Pass 9/13/2019 (8:00 - 10:00) 9/13/2019 (AM) 09/14/2019
Approved ready to stock store. Install exit sign on rear exit door so in retail area of store, door must be recognized as a exit door,
Corrections:


Miscellaneous/Other
Carried Forward
09/14/2019
1)Exit sign needed at storefront and a directional at opening of exitway to back of house. 2) the column that is in the walkway in the storage area needs to be sprayed to the minimum thickness of 1 5/8” and the upper face side of column in front of cabinets needs material added to maintain the thickness. To be rechecked prior to covering columns. 3) columns in the enclosed walkway and the two in the storage area need column protection.

Building Final Inspection Partial Pass 9/19/2019 (Morning) 9/23/2019 (AM) 09/19/2019
Corrections:


Miscellaneous/Other
Comment Only
09/19/2019
Ten-day temp was issued on 9-13 it is good till 9-23 please schedule Jon to extend temp.OK to open. Schedule final with fire marshal when ready.

Progress Inspection Partial Pass 10/31/2019
Corrections:


Miscellaneous/Other
Comment Only
10/31/2019
Columns in the storage area that was for the staging and buildout use with Apple that is turning to mall storage are partched with fireproofing to match the depth of the original product used. Approved to cover columns.

Miscellaneous/Other
Carried Forward
10/31/2019
Columns need wraps for protection of fireproofing, and entry to space to be completed.

Fire Inspection Final Passed 12/10/2019
Corrections:


Miscellaneous/Other
Comment Only
12/10/2019
Final approved per Kris K. Fire inspector

Building Final Inspection Passed 12/10/2019
Corrections:


Miscellaneous/Other
Comment Only
12/10/2019
Final approved for this permit