PRBD201902496
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Building Final Inspection | Pending | |||
Framing Inspection | Partial Pass | 7/31/2019 (12:30 - 2:30) | 7/31/2019 (PM) | 07/31/2019 |
Framing #1. Approved. A. Framing 2 require inspection as space is building sound wall to deck between existing tenant. Framing 3 is soffits around HVAC.. | ||||
Building Final Inspection | Partial Pass | 8/22/2019 (10:00 - 12:00) | 8/22/2019 (AM) | 08/22/2019 |
2nd floor - phase 1 of 6 ? No city stamped plans on site. A. Phase 1 - Permit Card on site, need PARTIAL PASS for above ceiling rough in, and PARTIAL PASS final (fire sprinkler/alarm , HVAC, Electrical, and Low voltage.) | ||||
Corrections:
Miscellaneous/Other
Comment Only
08/22/2019
Phase 1 final: A. Need Copy of City stamped plan on site before starting phase 2.
B. Phase 1 still requires electrical final, electrical low voltage final, HVAC final, and fire sprinkler and fire alarm final.
C. Building final request today- partial pass only.
|
||||
Fire Inspection Final | Not Ready | 8/22/2019 (10:00 - 12:00) | 8/22/2019 (AM) | 08/29/2019 |
Fire Inspection Final | Passed | 08/29/2019 | ||
Framing Inspection | Partial Pass | 9/6/2019 (10:00 - 12:00) | 9/6/2019 (AM) | 09/06/2019 |
Phase 2. Framing. Partial pass. A: call for above ceiling for sprinkler, permit by Ahern fire sprinkler. | ||||
Framing Inspection | Partial Pass | 10/31/2019 (10:00 - 12:00) | 10/31/2019 (AM) | 10/31/2019 |
Phase 1-5. A. Phase 3, no framing. Phase 4 framing approved, partial pass, | ||||
Above Ceiling Inspection | VOID | 01/09/2020 | ||
Framing Inspection | Passed | 12/4/2019 (8:00 - 10:00) | 12/4/2019 (AM) | 01/15/2020 |
Phase 5, of 5. Framing for small huddle room. | ||||
Corrections:
Miscellaneous/Other
Comment Only
12/04/2019
Framing - phase 5 of 5. A. Framing of small huddle room. Passed.
|
||||
Above Ceiling Inspection | Passed | 8/14/2019 (12:30 - 2:30) | 8/14/2019 (PM) | 01/15/2020 |
Phase one of 2. | ||||
Building Final Inspection | Failed | 1/15/2020 (8:00 - 10:00) | 1/15/2020 (AM) | 01/15/2020 |
A. Need HVAC final, and Electrical final for temp control, low voltage, office cubical partitions, and any other. B. No plumbing work as space had existing break room. C. Fire final approved 1/15/2020. D. Call for final building inspection when above items are completed...HAVING PERMIT CARD signed ON SITE ! | ||||
Building Final Inspection | Not Ready | 1/17/2020 (8:00 - 10:00) | 1/17/2020 (AM) | 01/17/2020 |
Suite 250 - 5 phase project occupied during construction. A. Building final - A. Need electrical final, and fire final prior to building final. |