PRBD201902595
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Fire Inspection Final | Pending | |||
| Building Final Inspection | Pending | |||
| Framing Inspection | Not Ready | 4/19/2019 (2:30 - 3:30) | 4/19/2019 (PM) | 04/19/2019 |
| Contractor called to cancel today's inspection. Did not remove from Jon's calendar. jsmidt 04/19/2019 8:31 AM | ||||
|
Corrections:
Miscellaneous/Other
Comment Only
04/19/2019
Inspection canceled
|
||||
| Framing Inspection | Passed w/ Conditions | 4/23/2019 (12:30 - 2:30) | 4/23/2019 (PM) | 04/23/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
04/23/2019
2x4 metal stud framing approved.
Framing of 2x2 furred wall is at 24” o.c. Where plan calls for it at 16”o.c. Approved due to it being a furred wall.
Contractor will need to use 2” foam panels as what is called out on plans for the exterior wall insulation, fiberglass batts will not work in a 2”x2” wall. Call for insulation inspection.
Sprinkler head at North entry will need to be moved, it is too close to the wall.
Sprinkler permit and inspection needed.
|
||||
| Insulation Inspection | Passed | 4/26/2019 (2:30 - 3:30) | 4/26/2019 (PM) | 04/26/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
04/26/2019
Spray foam used at exterior walls R-value approximately R14. Approved to cover
|
||||
| Framing Inspection | Passed | 2/21/2020 (10:00 - 12:00) | 2/21/2020 (PM) | 02/21/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
02/21/2020
Furred wall and back wall of showroom wall framing approved... ok to cover.
|
||||