Summary

PRBD201903299
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
Existing Tenant at the Mall of America will remain in the existing space but they are giving back a portion of the space back to the mall. The mall will be building a new demising wall between the spaces. Tenant will touch up finishes around new wall. Tenant will relocate light fixtures from space being given back to mall.
04/12/2019
04/23/2019
11/19/2019
05/23/2019

Locations

Permits

Permit Number: PRBD201903299

Building
Finaled
04/23/2019
11/19/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed 5/8/2019 (8:00 - 10:00) 5/8/2019 (AM) 05/08/2019
Corrections:


Miscellaneous/Other
Comment Only
05/08/2019
Demising wall framing to downsize the tenant space...Approved. Empty space will be inspected with future buildout. HVAC to pull permit for work to be done with separation of space. Call for above ceiling inspection and Hvac, electrical & Fire Marshall finals when ready prior to final building inspection.

Fire Inspection Final Passed 5/23/2019 (8:00 - 10:00) 5/23/2019 (AM) 05/23/2019
Framing Inspection Passed 5/23/2019 (8:00 - 10:00) 5/23/2019 (AM) 05/23/2019
Corrections:


Miscellaneous/Other
Comment Only
05/23/2019
Above ceiling approved

Building Final Inspection Passed 5/23/2019 (8:00 - 10:00) 5/23/2019 (AM) 05/23/2019
Corrections:


Miscellaneous/Other
Comment Only
05/23/2019
Final approved