Permit Application Status

PRBD201903566


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201903566
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
Remodel front of house for Leeann Chin Concept at MOA
04/18/2019
05/21/2019
04/05/2020
10/08/2019

Locations

Permits

Permit Number: PRBD201903566

Building
Finaled
05/21/2019
04/05/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 07/02/2019
Corrections:


Miscellaneous/Other
Comment Only
07/02/2019
Viewed the mall bulkhead and framing of the buildout bulkhead for partial covering to complete framing. Access panel needed in bulkhead for electrical junction box.

Framing Inspection Partial Pass 7/23/2019 (10:00 - 12:00) 7/23/2019 (AM) 07/23/2019
Corrections:


Miscellaneous/Other
Comment Only
07/23/2019
Wall framing approved. The platform in the plenum area behind the storage needs to have extra support to help hold up the platform since it is mostly held up with non structural framing. This platform will be for access to the grease duct for maintenance cleaning.

Framing Inspection Passed 8/5/2019 (8:00 - 10:00) 8/5/2019 (AM) 08/05/2019
Corrections:


Miscellaneous/Other
Comment Only
08/05/2019
Approved to cover ceilings . Fire inspection to be done prior to covering. Above ceiling approved.

Progress Inspection Passed 10/02/2019
Corrections:


Miscellaneous/Other
Comment Only
10/02/2019
Veiwed framing of horizontal shaft at 4th floor for grease duct termination through roof, firestops for grease duct, at shaft and through floor... approved.

Fire Inspection Final Not Ready 10/4/2019 (10:00 - 12:00) 10/4/2019 (AM) 10/04/2019
Building Final Inspection Not Ready 10/4/2019 (10:00 - 12:00) 10/4/2019 (AM) 10/04/2019
Corrections:


Miscellaneous/Other
Comment Only
10/04/2019
Not fully ready for final... plumbing and fire inspection final needed. Approved to bring in small wares,stock, and train.

Fire Inspection Final Passed 10/07/2019
Building Final Inspection Passed 10/8/2019 (8:00 - 10:00) 10/8/2019 (AM) 10/08/2019
Corrections:


Miscellaneous/Other
Comment Only
10/08/2019
Final approved, ok to open to public.