Summary

PRBD201903779
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
Interior tenant alteration of an existing space, for our White House Black Market store.
04/23/2019
07/30/2019
04/25/2020
10/28/2019

Locations

Permits

Permit Number: PRBD201903779

Building
Finaled
05/21/2019
04/25/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 9/9/2019 (10:00 - 12:00) 9/9/2019 (AM) 09/09/2019
Store space only: A. Wall Framing and patch column and beam fireproofing - partial pass. B. Call for store front bulkhead framing, patch fireproofing, and include the above ceiling inspection when ready.
Framing Inspection Partial Pass 9/16/2019 (8:00 - 10:00) 9/16/2019 (AM) 09/16/2019
Progress - Mall property expansion, main floor: A. Patch round columns steel fireproofing above on second floor. - OK. B.Main floor area requires all inspections above ceiling approvals for fire alarm wiring, fire sprinkler, electrical, and HVAC at rear dressing room area, prior to installing sheetrock ceiling. C. Provide all access panels in hard lid gypsum ceiling required by trade inspections and the building code.
Framing Inspection Passed 9/20/2019 (12:30 - 2:30) 9/20/2019 (PM) 09/20/2019
Above ceiling and storefront. Space is on grade. ALL TRADES SIGNED OFF AND APPROVED, EXCEPT LANCE FORGOT TO SIGN THE CARD.
Fire Inspection Final Passed 10/24/2019 (12:30 - 2:30) 10/24/2019 (PM) 10/24/2019
Building Final Inspection Partial Pass 10/24/2019 (12:30 - 2:30) 10/24/2019 (PM) 10/24/2019
Corrections:


Miscellaneous/Other
Comment Only
10/24/2019
1) electrical final needed 2) install accessible sign at fitting room. Approved to stock store.

Building Final Inspection Passed 10/28/2019 (12:30 - 2:30) 10/28/2019 (PM) 10/28/2019
Corrections:


Miscellaneous/Other
Comment Only
10/28/2019
Final approved , electrical inspection completed and signage to fitting room installed.