PRBD201905490
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Passed | 6/13/2019 (10:00 - 12:00) | 6/13/2019 (AM) | 06/13/2019 |
Corrections:
Miscellaneous/Other
Comment Only
06/13/2019
Wall framing approved, ok to cover.
|
||||
Building Final Inspection | Passed | 9/6/2019 (8:00 - 10:00) | 9/6/2019 (AM) | 09/06/2019 |
Corrections:
Miscellaneous/Other
Comment Only
09/06/2019
The only added weight to this awning at storefront is the decorative piping and the phaser blaster. The wall was designed to hold the awning, the added weight dust from the decorative features is minimal when calculated over the span of the storefront.
Approved to close permit.
|
||||
Fire Inspection Final | Passed | 9/6/2019 (8:00 - 10:00) | 9/6/2019 (AM) | 09/06/2019 |