Summary

PRBD201906100
Building
Finaled
GKII NORTHLAND CENTER LLC
Alteration/Repair/Replace
Not Required
Office remodel - Existing tenant suite 200 Northland Center 1
06/10/2019
09/05/2019
06/15/2020
12/18/2019

Locations

Permits

Permit Number: PRBD201906100

Building
Finaled
09/05/2019
06/15/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 9/17/2019 (2:30 - 3:30) 9/17/2019 (PM) 09/17/2019
Various areas on second floor suite 200 for cushman Wakefield tenant, per plan.
Corrections:


Miscellaneous/Other
Carried Forward
09/17/2019
Framing. Need plumbing permit and rough in, need mechanical permit for diffusers and other, need fire sprinkler and fire alarm permits (huddle room strobe), need electrical permit. A. Need building inspector back for above ceiling and for fire caulking ANY/ALL/FLOOR PENETRATIONS for new plumbing/other.

Building Final Inspection Passed w/ Conditions 11/19/2019 (8:00 - 10:00) 11/19/2019 (AM) 11/19/2019
Final approved, contingent upon adding exit signs by fire marshal, and fire alarm test, with EM lighting by ceiling lites or wall packs. Note- green exit signs used, have no 90 minute EM lighting capability.
Fire Inspection Final Not Ready 11/19/2019 (8:00 - 10:00) 11/19/2019 (AM) 11/20/2019
Fire Inspection Final Passed 12/18/2019