PRBD201906175
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Passed w/ Conditions | 7/9/2019 (12:30 - 2:30) | 7/9/2019 (PM) | 07/09/2019 |
Existing space, existing ceiling strobes in each conference room, and additional ceiling strobes in large open office space - all strobes must be synced. A. One existing ceiling fluorescent in large open office area has 90 minute battery pack backup. Electrical contractor to confirm building emergency generator circuits in this space. B. Existing sink, dishwasher countertops are ADA compliant. C. Sprinkler permit required to eliminate existing heads too close together due to elimination of existing walls. D. Existing plumbing and HVAC above ceiling. | ||||
Fire Inspection Final | Passed | 8/1/2019 (8:00 - 10:00) | 8/1/2019 (AM) | 08/01/2019 |
Building Final Inspection | Passed | 8/2/2019 (8:00 - 10:00) | 8/2/2019 (AM) | 08/02/2019 |
Need electrical final, on schedule for today. | ||||
Corrections:
Miscellaneous/Other
Resolved
08/02/2019
BUILDING FINAL - approved. Still need furniture completed, and electrical permit final approved.
|