Permit Application Status

PRBD201906175


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201906175
Building
Finaled
GKII NORTHLAND CENTER LLC
Alteration/Repair/Replace
Not Required
Tenant improvement at Northland Center
06/11/2019
06/26/2019
01/29/2020
08/02/2019

Locations

Permits

Permit Number: PRBD201906175

Building
Finaled
06/26/2019
01/29/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed w/ Conditions 7/9/2019 (12:30 - 2:30) 7/9/2019 (PM) 07/09/2019
Existing space, existing ceiling strobes in each conference room, and additional ceiling strobes in large open office space - all strobes must be synced. A. One existing ceiling fluorescent in large open office area has 90 minute battery pack backup. Electrical contractor to confirm building emergency generator circuits in this space. B. Existing sink, dishwasher countertops are ADA compliant. C. Sprinkler permit required to eliminate existing heads too close together due to elimination of existing walls. D. Existing plumbing and HVAC above ceiling.
Fire Inspection Final Passed 8/1/2019 (8:00 - 10:00) 8/1/2019 (AM) 08/01/2019
Building Final Inspection Passed 8/2/2019 (8:00 - 10:00) 8/2/2019 (AM) 08/02/2019
Need electrical final, on schedule for today.
Corrections:


Miscellaneous/Other
Resolved
08/02/2019
BUILDING FINAL - approved. Still need furniture completed, and electrical permit final approved.