PRBD201906224
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Insulation Inspection | Failed | 07/22/2019 | ||
Ceiling insulation full depth by fiberglass batt at area opened up, for floor rating. | ||||
Corrections:
Miscellaneous/Other
Carried Forward
07/22/2019
Work covered with out inspection.
|
||||
Framing Inspection | Failed | 7/22/2019 (8:00 - 10:00) | 7/22/2019 (AM) | 07/22/2019 |
needs to reschedule - Mark with Restoration. mshulfer 06/27/2019 9:34 Inspection canceled by contractor (second time) NelsonThorpe Sarah 07/05/2019 9:03 AM | ||||
Corrections:
Miscellaneous/Other
Comment Only
07/22/2019
Work covered with out inspection.
|
||||
Building Final Inspection | Passed | 11/27/2019 (12:30 - 2:30) | 11/27/2019 (PM) | 11/27/2019 |
Insulation Inspection | Passed | 12/02/2019 | ||
Corrections:
Miscellaneous/Other
Outstanding
07/22/2019
Work covered with out inspection.
|