Permit Application Status

PRBD201907516


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201907516
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
Tenant finish for new Lovisa store.
07/08/2019
08/07/2019
04/06/2020

Locations

Permits

Permit Number: PRBD201907516

Building
Finaled
08/07/2019
04/06/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 8/29/2019 (8:00 - 10:00) 8/29/2019 (AM) 08/29/2019
Corrections:


Miscellaneous/Other
Carried Forward
08/29/2019
Need to recheck the back wall that is a 2 hour wall. Remove single damaged layer and layer the gypsum...and leave open for inspection.

Miscellaneous/Other
Comment Only
08/29/2019
Approved to cover furred walls closet walls, leave open the section that piping will be inspected for firestops at closet wall. Fire inspection needed for ceiling.

Fire Inspection Final Passed w/ Conditions 9/30/2019 (10:00 - 12:00) 9/30/2019 (AM) 09/30/2019
Corrections:


Miscellaneous/Other
Comment Only
09/30/2019
Hang fire extinguisher near cash wrap. Fire final approved pending city of Bloomington building inspector final inspection

Building Final Inspection Failed 9/30/2019 (10:00 - 12:00) 9/30/2019 (AM) 09/30/2019
Corrections:


Miscellaneous/Other
Comment Only
09/30/2019
Not ready.

Progress Inspection Not Ready 10/03/2019
Corrections:


Miscellaneous/Other
Comment Only
10/03/2019
Space is still not complete enough to stock. Workers are still working at storefront and tile. This space does not have any lockable storage space inside to keep merchandise locked up while under construction. No stocking at this time till all work is completed, including the plaster finish that needs to be installed. Call for temp final when all work and construction work is completed. Any merchandise to be removed and stored offsite till temp occupancy is approved.

Building Final Inspection Passed 10/9/2019 (8:00 - 10:00) 10/9/2019 (AM) 10/09/2019
Corrections:


Miscellaneous/Other
Comment Only
10/09/2019
Final approved.ok to open to public.