Summary

PRBD201907961
Building
Finaled
THE BEDROOM INC
Other
Not Required
Interior Permit for work at the HOM Furniture Bloomington (Permit # PRBD201901049). This is the plan review submittal for our merchandise and interior package plan.
07/16/2019
08/26/2019
01/16/2021
07/20/2020

Locations

Permits

Permit Number: PRBD201907961

Building
Finaled
08/26/2019
01/16/2021

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 12/13/2019 (10:00 - 12:00) 12/13/2019 (AM) 12/13/2019
A. No city approved stamped plans on site. Construction trailer is locked. No one from Benson Orthe - General contractor - Ken, on site. Lower and main level steel stud framing (Walk Through). B. Restrooms must meet MN state accessibility code dimensions. B. Call for framing of all ceiling clouds, and all elevator shaft wall framing into elevator car openings.
Corrections:


Miscellaneous/Other
Carried Forward
12/13/2019
Framing request. A. No stamped approved plans on site, construction trailer locked, Ken S. from Benson-Orth, is not on site. B. Framing/plumbing relationship of all bathrooms must meet MN State 2015 accessibility code. SEE STAMPED CITY APPROVED BUILDING PLAN. C. Call for all concrete or masonry elevator shaft wall framing AND GYPSUM INSPECTION AND FIRE CAULK INSPECTION. D. FIRE RATED PROTECTION OF ALL STRUCTURAL COLUMNS, AND BEAMS, SEE STAMPED CITY PLAN.

Progress Inspection Partial Pass 3/4/2020 (12:30 - 2:30) 3/4/2020 (PM) 03/04/2020
Progress inspection - environmental health, mechanical, elevators, stairwells, restrooms.
Progress Inspection Partial Pass 5/4/2020 (12:30 - 2:30) 5/4/2020 (PM) 05/04/2020
Same day progress requested by B. Post.NelsonThorpe Sarah 05/04/2020 9:12 AM
Corrections:


Miscellaneous/Other
Comment Only
05/04/2020
Progress walk thru. A. Elevators- warning signage at controls inside and outside of elevator car. ( upon fire smoke alarm ) elevators will shut down, follow exits to exit building. B. Upon fire sprinkler activation, water will continue to flow, elevators will continue to operate, but upon smoke detectors alarm elevator car will shut down and recall to main floor. C. Upon a loss of power, elevator will recall to main floor, exit building. (into stairwells, or main floor to exterior.) D. Elevators have communication from interior of elevator to exterior of elevator for fire fighters. B. FINAL WALK THRU - A. Mirrors inside restrooms, all must have bottom edge of mirror reflective surface 40 inches above floor max. B. Restroom accessible signage must be on the exterior latch side of the door, measured 48 inches max to the brail. C. Exterior landscape, and exterior parking lot stripping, and exterior night lighting must be tested and passed per city planning, prior to a final certificate of occupancy. D. Final for all trade inspections including environmental health must also be completed and final approved.

Gypsum Board/Sheet Rock Inspection Passed 05/17/2020
Fire rated stairwells, mechanical shafts, fire caulking.
Insulation Inspection Passed 05/17/2020
Framing Inspection Passed 05/17/2020
Corrections:


Miscellaneous/Other
Outstanding
12/13/2019
Framing request. A. No stamped approved plans on site, construction trailer locked, Ken S. from Benson-Orth, is not on site. B. Framing/plumbing relationship of all bathrooms must meet MN State 2015 accessibility code. SEE STAMPED CITY APPROVED BUILDING PLAN. C. Call for all concrete or masonry elevator shaft wall framing AND GYPSUM INSPECTION AND FIRE CAULK INSPECTION. D. FIRE RATED PROTECTION OF ALL STRUCTURAL COLUMNS, AND BEAMS, SEE STAMPED CITY PLAN.

Lath Inspection Passed 1/27/2020 (10:00 - 12:00) 1/27/2020 (AM) 05/17/2020
Stucco lathe - south side section of building exterior. 2 coat cement stucco, with expansion joints. with 3rd coat finish colored coat. Note - areas of individual stucco sections exceed 144 square feet or 12ft x 12 ft, per ASTM specifications. Actual new stucco sections dimensions are 12 ft x 15 ft. Contractor has been informed of this. INSPECTOR COMMENT; allow 7 day minimum drying time between coats, to reduce shrinkage cracking. Passed, with conditions.
Progress Inspection Passed 05/17/2020
Above Ceiling Inspection Passed 05/17/2020
Building Final Inspection Issue CO 07/20/2020