PRBD201907961
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Partial Pass | 12/13/2019 (10:00 - 12:00) | 12/13/2019 (AM) | 12/13/2019 |
Miscellaneous/Other
Carried Forward
12/13/2019
Framing request. A. No stamped approved plans on site, construction trailer locked, Ken S. from Benson-Orth, is not on site.
B. Framing/plumbing relationship of all bathrooms must meet MN State 2015 accessibility code. SEE STAMPED CITY APPROVED BUILDING PLAN.
C. Call for all concrete or masonry elevator shaft wall framing AND GYPSUM INSPECTION AND FIRE CAULK INSPECTION.
D. FIRE RATED PROTECTION OF ALL STRUCTURAL COLUMNS, AND BEAMS, SEE STAMPED CITY PLAN.
|
||||
Progress Inspection | Partial Pass | 3/4/2020 (12:30 - 2:30) | 3/4/2020 (PM) | 03/04/2020 |
Progress Inspection | Partial Pass | 5/4/2020 (12:30 - 2:30) | 5/4/2020 (PM) | 05/04/2020 |
Miscellaneous/Other
Comment Only
05/04/2020
Progress walk thru. A. Elevators- warning signage at controls inside and outside of elevator car. ( upon fire smoke alarm ) elevators will shut down, follow exits to exit building. B. Upon fire sprinkler activation, water will continue to flow, elevators will continue to operate, but upon smoke detectors alarm elevator car will shut down and recall to main floor. C. Upon a loss of power, elevator will recall to main floor, exit building. (into stairwells, or main floor to exterior.) D. Elevators have communication from interior of elevator to exterior of elevator for fire fighters.
B. FINAL WALK THRU - A. Mirrors inside restrooms, all must have bottom edge of mirror reflective
surface 40 inches above floor max. B. Restroom accessible signage must be on the exterior latch side of the door, measured 48 inches max to the brail. C. Exterior landscape, and exterior parking lot stripping, and exterior night lighting must be tested and passed per city planning, prior to a final certificate of occupancy. D. Final for all trade inspections including environmental health must also be completed and final approved.
|
||||
Gypsum Board/Sheet Rock Inspection | Passed | 05/17/2020 | ||
Insulation Inspection | Passed | 05/17/2020 | ||
Framing Inspection | Passed | 05/17/2020 | ||
Miscellaneous/Other
Outstanding
12/13/2019
Framing request. A. No stamped approved plans on site, construction trailer locked, Ken S. from Benson-Orth, is not on site.
B. Framing/plumbing relationship of all bathrooms must meet MN State 2015 accessibility code. SEE STAMPED CITY APPROVED BUILDING PLAN.
C. Call for all concrete or masonry elevator shaft wall framing AND GYPSUM INSPECTION AND FIRE CAULK INSPECTION.
D. FIRE RATED PROTECTION OF ALL STRUCTURAL COLUMNS, AND BEAMS, SEE STAMPED CITY PLAN.
|
||||
Lath Inspection | Passed | 1/27/2020 (10:00 - 12:00) | 1/27/2020 (AM) | 05/17/2020 |
Progress Inspection | Passed | 05/17/2020 | ||
Above Ceiling Inspection | Passed | 05/17/2020 | ||
Building Final Inspection | Issue CO | 07/20/2020 |