Summary

PRBD201908331
Building
Expired
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
New retail renovation at Mall of American (W326)
07/24/2019
09/19/2019
05/02/2020

Locations

Permits

Permit Number: PRBD201908331

Building
Expired
09/19/2019
05/02/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 10/2/2019 (10:00 - 12:00) 10/2/2019 (AM) 10/02/2019
Corrections:


Miscellaneous/Other
Comment Only
10/02/2019
Interior walls approved. Call for reinspection of the storefront, corrections given to framers and contractor to resupport bulkhead and the gypsum install prior to wood in storefront . Above ceiling inspection to also be called in and the fireproofing patching to be verified.

Framing Inspection Partial Pass 10/8/2019 (10:00 - 12:00) 10/8/2019 (AM) 10/08/2019
Corrections:


Miscellaneous/Other
Comment Only
10/08/2019
Box beam installed at storefront to support extended bulkhead. Framing of storefront approved.

Above Ceiling Inspection Passed 10/14/2019 (8:00 - 10:00) 10/14/2019 (AM) 10/14/2019
Corrections:


Miscellaneous/Other
Comment Only
10/14/2019
Fireproofing patching and hard lid ceiling framing at storefront, and above ceiling... approved

Progress Inspection Passed 10/28/2019 (2:30 - 3:30) 10/28/2019 (PM) 10/28/2019
Corrections:


Miscellaneous/Other
Comment Only
10/28/2019
Above ceiling approved.

Building Final Inspection Partial Pass 10/31/2019 (12:30 - 2:30) 10/31/2019 (PM) 10/31/2019
Corrections:


Miscellaneous/Other
Comment Only
10/31/2019
Approved for bringing in small wares and stock once cleaning is completed. Full final for this permit is contingent on all inspections being completed and approved, and final building to be the last inspection for approval. Final is set for 11/4/19 , all to be completed for that final.

Fire Inspection Final Passed 10/31/2019 (12:30 - 2:30) 10/31/2019 (PM) 11/01/2019
Building Final Inspection Passed 11/04/2019
Corrections:


Miscellaneous/Other
Comment Only
11/04/2019
Final approved and ok to open. E H to do any follow up inspection once open.