PRBD201909410
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Framing Inspection | Partial Pass | 8/27/2019 (10:00 - 12:00) | 8/27/2019 (AM) | 08/27/2019 |
| Single story portion of building - non sprinkler. A. Wall framing partial approved. B. Call for above ceiling for one hour rated separation to corridor for patching and fire caulk for penetrations both sides of wall. | ||||
| Above Ceiling Inspection | Passed w/ Conditions | 9/20/2019 (8:00 - 10:00) | 9/20/2019 (AM) | 09/20/2019 |
| Above ceiling non sprinklered 1 hour corridor - PENETRATIONS fire caulk. APPROVED. NOTE - Have hallway ceiling tiles removed for HVAC ABOVE CEILING INSPECTION. Duct open to hallway ceiling required fire damper. | ||||
| Fire Inspection Final | Passed | 10/1/2019 (8:00 - 10:00) | 10/1/2019 (AM) | 10/01/2019 |
| Cancelled today's inspection as Fire alarm test is 10/01/2019, tks. jsmidt 09/30/2019 9:19 AM | ||||
| Building Final Inspection | Passed | 10/1/2019 (8:00 - 10:00) | 10/1/2019 (AM) | 10/01/2019 |
| Cancelled for 09/30/2019 as Fire alarm test is on 10/01/2019, tks. jsmidt 09/30/2019 9:19 AM | ||||