PRBD201910003
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Footing Inspection | Passed | 12/16/2019 (12:30 - 2:30) | 12/16/2019 (PM) | 12/16/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
12/16/2019
Stripped footings with rebar as per plan for south half of building on sandy soil approved.
|
||||
| Footing Inspection | Partial Pass | 12/17/2019 (12:30 - 2:30) | 12/17/2019 (PM) | 12/17/2019 |
| Pour #2 footing.A. Continuous strip footing with continuous rebar per plan. B. Wet set footing dowels for 16 inch on center (core fill CMU Foundation walls per plan. ) C. Special inspections HAS NOT ARRIVED. D. Partial pass, as ongoing footing inspections still remain. | ||||
| Footing Inspection | Partial Pass | 12/19/2019 (12:30 - 2:30) | 12/19/2019 (PM) | 12/19/2019 |
| 2 4x4ft pad footings for concrete piers. Balance of east strip footing with large 5x5 footing. PSI COMPANY - special inspector, on site, only doing concrete testing ? REBAR APPROVED BY CITY INSPECTOR. 30 DEGREE F temperature. | ||||
| Footing Inspection | Passed | 12/20/2019 (10:00 - 12:00) | 12/20/2019 (AM) | 12/20/2019 |
| Completion of footings and including 2 poured reinforced concrete piers. | ||||
| Footing Inspection | Passed | 1/28/2020 (10:00 - 12:00) | 1/28/2020 (AM) | 01/28/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
01/28/2020
Eight footing pads, each being 4‘ x 4‘ x 12“ deep with number five rebar each way all on sandy soil approved.
|
||||
| Footing Inspection | Passed | 1/29/2020 (10:00 - 12:00) | 1/29/2020 (AM) | 01/29/2020 |
|
Corrections:
20"x8" strip footings per approved drawing on sandy soil-OK
Comment Only
01/29/2020
8 foot in pads, 4 x 4 x 12“ deep with number five rebar. Four columns northside approved.
|
||||
| Footing Inspection | Passed | 1/30/2020 (10:00 - 12:00) | 1/30/2020 (AM) | 01/30/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
01/30/2020
Eight columns on northside complete. OK to place concrete.
|
||||
| Footing Inspection | Passed | 1/31/2020 (10:00 - 12:00) | 1/31/2020 (AM) | 01/31/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
01/31/2020
Eight foundation columns for canopies at south end of project approved.
|
||||
| Framing Inspection | Passed | 4/8/2020 (10:00 - 12:00) | 4/8/2020 (AM) | 04/08/2020 |
| Building Final Inspection | Failed | 6/12/2020 (10:00 - 12:00) | 6/12/2020 (AM) | 06/12/2020 |
|
Corrections:
Miscellaneous/Other
Carried Forward
06/12/2020
Provide full ADA access from parking lot to building. Finish roof and siding work. Need final electrical approval. Call for reinspection.
|
||||
| Fire Inspection Final | Partial Pass | 6/11/2020 (12:30 - 2:30) | 6/11/2020 (PM) | 06/16/2020 |
| Fire Inspection Final | Passed | 6/19/2020 (8:00 - 10:00) | 6/19/2020 (AM) | 06/19/2020 |
| Building Final Inspection | Issue TCO | 6/19/2020 (8:00 - 10:00) | 6/19/2020 (AM) | 06/19/2020 |
|
Corrections:
Miscellaneous/Other
Resolved
06/19/2020
Provide full ADA access from parking lot to building. Finish roof and siding work. Need final electrical approval. Call for reinspection.
|
||||
|
Miscellaneous/Other
Carried Forward
06/19/2020
Provide handicap parking signage as per ADA. Complete second layer of paving on the path to provide smooth transition to concrete for wheelchair access. Complete trim on metal roofing. Provide cane guard protection at left drinking fountain for height exceeding 27 inches. 10 day temporary occupancy approved, call for reinspection.
|
||||
| Building Final Inspection | Passed | 7/9/2020 (10:00 - 12:00) | 7/9/2020 (AM) | 07/09/2020 |
|
Corrections:
Miscellaneous/Other
Resolved
07/09/2020
Provide handicap parking signage as per ADA. Complete second layer of paving on the path to provide smooth transition to concrete for wheelchair access. Complete trim on metal roofing. Provide cane guard protection at left drinking fountain for height exceeding 27 inches. 10 day temporary occupancy approved, call for reinspection.
|
||||