PRBD201910038
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Fire Inspection Final | Failed | 9/26/2019 (10:00 - 12:00) | 9/26/2019 (AM) | 09/26/2019 |
Building Final Inspection | Failed | 9/26/2019 (10:00 - 12:00) | 9/26/2019 (AM) | 09/26/2019 |
Building Final Inspection | Issue TCO | 10/1/2019 (12:30 - 2:30) | 10/1/2019 (PM) | 10/01/2019 |
Miscellaneous/Other
Carried Forward
10/01/2019
Final - 30 day temp. A. ORIGINAL STORE EAST TO WEST storage hallway needs EM emergency lighting, as west exit signage las no EM lighting. B. New storage space - added additional south storage area that requires all shelving fastened at the top back side of shelving into the building wall vertical structural members. C. 30 day temp, call for
re inspection before 30 days to inspect.
|
||||
Fire Inspection Final | Partial Pass | 10/1/2019 (12:30 - 2:30) | 10/1/2019 (PM) | 10/01/2019 |
Miscellaneous/Other
Carried Forward
10/01/2019
30 day temp co. Exit door must be identifiable and sprinkler inspection needed for final.
|
||||
Fire Inspection Final | Passed | 04/13/2020 | ||
Miscellaneous/Other
Outstanding
10/01/2019
30 day temp co. Exit door must be identifiable and sprinkler inspection needed for final.
|
||||
Building Final Inspection | Passed | 5/12/2020 (10:00 - 12:00) | 5/12/2020 (AM) | 05/12/2020 |
Miscellaneous/Other
Outstanding
10/01/2019
Final - 30 day temp. A. ORIGINAL STORE EAST TO WEST storage hallway needs EM emergency lighting, as west exit signage las no EM lighting. B. New storage space - added additional south storage area that requires all shelving fastened at the top back side of shelving into the building wall vertical structural members.
|