Permit Application Status

PRBD201910038


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201910038
Building
Expired
KRAUS-ANDERSON INC
Other
Not Required
Additional warehouse space racking. Intent to install 10 foot racking in an additional space of the store.
08/27/2019
09/10/2019
11/08/2020

Locations

Permits

Permit Number: PRBD201910038

Building
Expired

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Fire Inspection Final Failed 9/26/2019 (10:00 - 12:00) 9/26/2019 (AM) 09/26/2019
Building Final Inspection Failed 9/26/2019 (10:00 - 12:00) 9/26/2019 (AM) 09/26/2019
Fire marshal - did not pass. A. Storage room and hallway to storage room requires fire sprinkler coverage and permit, emergency exiting lighting for loss of power, exit signage for path of egress. B. Storage room separation fire rating, with sprinkler coverage is required.
Building Final Inspection Issue TCO 10/1/2019 (12:30 - 2:30) 10/1/2019 (PM) 10/01/2019
30 day temp occupancy. A. New storage area back of house. A: Mount south shelving in new storage space to south wall. Fasten top most upper rear side of ALL shelving units, into south exterior wall/studs. B. Need emergency lighting at original store back of house (east to west storage hallway. )
Corrections:


Miscellaneous/Other
Carried Forward
10/01/2019
Final - 30 day temp. A. ORIGINAL STORE EAST TO WEST storage hallway needs EM emergency lighting, as west exit signage las no EM lighting. B. New storage space - added additional south storage area that requires all shelving fastened at the top back side of shelving into the building wall vertical structural members. C. 30 day temp, call for re inspection before 30 days to inspect.

Fire Inspection Final Partial Pass 10/1/2019 (12:30 - 2:30) 10/1/2019 (PM) 10/01/2019
Corrections:


Miscellaneous/Other
Carried Forward
10/01/2019
30 day temp co. Exit door must be identifiable and sprinkler inspection needed for final.

Fire Inspection Final Passed 04/13/2020
Corrections:


Miscellaneous/Other
Outstanding
10/01/2019
30 day temp co. Exit door must be identifiable and sprinkler inspection needed for final.

Building Final Inspection Passed 5/12/2020 (10:00 - 12:00) 5/12/2020 (AM) 05/12/2020
Store is closed due to Covid 19, State of MN. A. Fire final was attained in April, 2020.
Corrections:


Miscellaneous/Other
Outstanding
10/01/2019
Final - 30 day temp. A. ORIGINAL STORE EAST TO WEST storage hallway needs EM emergency lighting, as west exit signage las no EM lighting. B. New storage space - added additional south storage area that requires all shelving fastened at the top back side of shelving into the building wall vertical structural members.