PRBD201910382
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Framing Inspection | Passed w/ Conditions | 10/1/2019 (8:00 - 10:00) | 10/1/2019 (AM) | 10/01/2019 |
| 1 single office suite - 2nd floor south side. Need electrical rough in passed today. Non sprinklered building. Framing approved. | ||||
| Fire Inspection Final | Passed | 12/30/2019 (12:30 - 2:30) | 12/30/2019 (PM) | 12/30/2019 |
| Building Final Inspection | Passed | 12/30/2019 (12:30 - 2:30) | 12/30/2019 (PM) | 12/30/2019 |
| Final building, with fire final. Existing floor office, Non sprinklered, with smoke detection in the 1 hr rated corridors. Main entry/exit door into corridor, existing . | ||||