Permit Application Status

PRBD201910382


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201910382
Building
Finaled
RWIC OFFICE PARTNERSHIP
Alteration/Repair/Replace
Not Required
Add office into existing suite 240. Existing area already finished
09/05/2019
09/13/2019
06/27/2020
12/30/2019

Locations

Permits

Permit Number: PRBD201910382

Building
Finaled
09/13/2019
06/27/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed w/ Conditions 10/1/2019 (8:00 - 10:00) 10/1/2019 (AM) 10/01/2019
1 single office suite - 2nd floor south side. Need electrical rough in passed today. Non sprinklered building. Framing approved.
Fire Inspection Final Passed 12/30/2019 (12:30 - 2:30) 12/30/2019 (PM) 12/30/2019
Building Final Inspection Passed 12/30/2019 (12:30 - 2:30) 12/30/2019 (PM) 12/30/2019
Final building, with fire final. Existing floor office, Non sprinklered, with smoke detection in the 1 hr rated corridors. Main entry/exit door into corridor, existing .