PRBD201911562
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Fire Inspection Final | Passed | 5/6/2020 (12:30 - 2:30) | 5/6/2020 (PM) | 05/06/2020 |
Contractor cancelled today and rescheduled to 5/6/2020.jsmidt 05/05/2020 8:17 AM | ||||
Building Final Inspection | Partial Pass | 5/6/2020 (12:30 - 2:30) | 5/6/2020 (PM) | 05/06/2020 |
Contractor cancelled today and rescheduled to 5/6/2020.jsmidt 05/05/2020 8:17 AM No Final Inspection to be scheduled until Sac Determination is complete. jsmidt 10/16/2019 11:07 AM | ||||
Corrections:
Miscellaneous/Other
Comment Only
05/06/2020
Final - A. Complete restroom stall for woman’s restroom. B. Trash room - passed.
C. Exit signage, EM lighting, restroom accessible signage - passed.
D. Sac charges paid - $22,333.00-passed. E. Store front signage with permit from planning has been attained, needs final inspection. F. Need trade finals for fire, electrical, low voltage, plumbing, HVAC, PRIOR TO FINAL BUILDING.
|
||||
Progress Inspection | Passed | 5/11/2020 (12:30 - 2:30) | 5/11/2020 (PM) | 05/11/2020 |
Final - approved. Sac charges paid. All trade finals have passed. Sign permit issued from planing. All massage rooms can not be used, without city of Bloomington environmental health license to specific individual. | ||||
Above Ceiling Inspection | Passed | 05/11/2020 | ||
Corrections:
Miscellaneous/Other
Outstanding
04/29/2020
George, I need electrical, low voltage, temperature control wiring, above ceiling passed.
|
||||
Above Ceiling Inspection | Passed | 4/29/2020 (Afternoon) | 4/29/2020 (PM) | 05/11/2020 |
Corrections:
Miscellaneous/Other
Carried Forward
04/29/2020
George, I need electrical, low voltage, temperature control wiring, above ceiling passed.
|
||||
Framing Inspection | Passed | 3/6/2020 (8:00 - 10:00) | 3/6/2020 (AM) | 05/11/2020 |
Framing - A. Reviewed exit signage and EM lighting. B. Ok to one side walls. C. Reviewed accessibility. | ||||
Building Final Inspection | Passed | 05/11/2020 | ||
Final - passed. See corrections for notes and sac charges paid. | ||||
Corrections:
Miscellaneous/Other
Resolved
05/11/2020
Final - A. Complete restroom stall for woman’s restroom. B. Trash room - passed.
C. Exit signage, EM lighting, restroom accessible signage - passed.
D. Sac charges paid - $22,333.00-passed. E. Store front signage with permit from planning has been attained, needs final inspection. F. Need trade finals for fire, electrical, low voltage, plumbing, HVAC, PRIOR TO FINAL BUILDING.
|