PRBD201911562
Building
Finaled
KRAUS-ANDERSON INC
Alteration/Repair/Replace
Not Required
Tenant improvement work to change an old Timberlodge Steakhouse to a hair and beauty salon
10/01/2019
10/16/2019
11/07/2020
05/11/2020

Locations

Permits

Permit Number: PRBD201911562

Building
Finaled

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Fire Inspection Final Passed 5/6/2020 (12:30 - 2:30) 5/6/2020 (PM) 05/06/2020
Building Final Inspection Partial Pass 5/6/2020 (12:30 - 2:30) 5/6/2020 (PM) 05/06/2020
Miscellaneous/Other
Comment Only
05/06/2020
Final - A. Complete restroom stall for woman’s restroom. B. Trash room - passed. C. Exit signage, EM lighting, restroom accessible signage - passed. D. Sac charges paid - $22,333.00-passed. E. Store front signage with permit from planning has been attained, needs final inspection. F. Need trade finals for fire, electrical, low voltage, plumbing, HVAC, PRIOR TO FINAL BUILDING.

Progress Inspection Passed 5/11/2020 (12:30 - 2:30) 5/11/2020 (PM) 05/11/2020
Above Ceiling Inspection Passed 05/11/2020
Miscellaneous/Other
Outstanding
04/29/2020
George, I need electrical, low voltage, temperature control wiring, above ceiling passed.

Above Ceiling Inspection Passed 4/29/2020 (Afternoon) 4/29/2020 (PM) 05/11/2020
Miscellaneous/Other
Carried Forward
04/29/2020
George, I need electrical, low voltage, temperature control wiring, above ceiling passed.

Framing Inspection Passed 3/6/2020 (8:00 - 10:00) 3/6/2020 (AM) 05/11/2020
Building Final Inspection Passed 05/11/2020
Miscellaneous/Other
Resolved
05/11/2020
Final - A. Complete restroom stall for woman’s restroom. B. Trash room - passed. C. Exit signage, EM lighting, restroom accessible signage - passed. D. Sac charges paid - $22,333.00-passed. E. Store front signage with permit from planning has been attained, needs final inspection. F. Need trade finals for fire, electrical, low voltage, plumbing, HVAC, PRIOR TO FINAL BUILDING.