PRBD201912750
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
EH Final Inspection | Pending | |||
Framing Inspection | Passed | 1/15/2020 (8:00 - 10:00) | 1/15/2020 (AM) | 01/15/2020 |
No framing under scope of permitted work. A. Plumbing, electrical, and environmental health inspections required for rough in and final. B. Building and fire marshal finals required. C. Note “two” accessible seating area required per submitted plan. Must have wheel chair clearance and symbol of accessibility identification. D. 2015 MN state accessibility side wheel chair reach range must be max 46 inch above floor surface over a 24 inch or less counter surface. | ||||
Fire Inspection Final | Passed | 1/31/2020 (8:00 - 10:00) | 1/31/2020 (AM) | 01/31/2020 |
Building Final Inspection | Passed | 1/31/2020 (8:00 - 10:00) | 1/31/2020 (AM) | 01/31/2020 |
Note, there is one of two open environmental health permits ? No card on site. |