PRBD201912829
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Framing Inspection | Passed w/ Conditions | 11/14/2019 (8:00 - 10:00) | 11/14/2019 (AM) | 11/14/2019 |
|
Corrections:
Miscellaneous/Other
Outstanding
11/14/2019
Framing - A. Provide floor penetrations
fire-caulking at plumbing in break-room
B. CALL FOR ALL ABOVE CEILING INSPECTIONS WITH PERMITS FOR
BUILDING, ELECTRICAL, HVAC, FIRE SPRINKLER, LOW VOLTAGE DATA AND FIRE ALARM WIRING.
C. PATCH HOLES AND OPENINGS AT CORRIDOR WALL ALONG NEW SPACE ABOVE CEILING ALONG INSIDE ONLY OF NEW SPACE.
D. CALL FOR ABOVE CEILING RE INSPECTIONS WHEN READY FOR ALL TRADES.
|
||||
| Building Final Inspection | Passed | 1/3/2020 (8:00 - 10:00) | 1/3/2020 (AM) | 01/03/2020 |
| Fire Inspection Final | Passed | 1/3/2020 (8:00 - 10:00) | 1/3/2020 (AM) | 01/10/2020 |