Summary

PRBD201913790
Building
Finaled
UNITED LAND LLC
New
Not Required
118 Unit Senior Living - Cherrywood Pointe of Bloomington
11/12/2019
06/19/2020
11/15/2021
05/19/2021

Locations

Permits

Permit Number: PRBD201913790

Building
Finaled
06/19/2020
11/15/2021

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Passed 7/7/2020 7/7/2020 (AM) 07/07/2020
Corrections:


Miscellaneous/Other
Comment Only
07/07/2020
Framing and fire caulking on south end of fourth floor approved contingent on mechanical rough in approval. Progress inspection on retaining wall with Geo grid approved.

Progress Inspection Passed 7/13/2020 (8:00 - 10:00) 7/13/2020 (AM) 07/13/2020
Corrections:


Miscellaneous/Other
Comment Only
07/13/2020
Insulation at south end of fourth floor approved in individual units only.

Progress Inspection Passed 7/14/2020 (8:00 - 10:00) 7/14/2020 (AM) 07/14/2020
Corrections:


Miscellaneous/Other
Comment Only
07/14/2020
Framing and fire caulking approved along connecting Corredor on fourth floor.

Progress Inspection Passed 7/15/2020 (8:00 - 10:00) 7/15/2020 (AM) 07/15/2020
Corrections:


Miscellaneous/Other
Comment Only
07/15/2020
Framing and fire caulking of south corridor on fourth floor approved.

Progress Inspection Passed 7/17/2020 (8:00 - 10:00) 7/17/2020 (AM) 07/17/2020
Corrections:


Miscellaneous/Other
Comment Only
07/17/2020
Framing and fire caulking in connecting corridor approved. Insulation in units on connecting corridor approved.

Progress Inspection Passed 7/22/2020 (8:00 - 10:00) 7/22/2020 (AM) 07/22/2020
Corrections:


Miscellaneous/Other
Comment Only
07/22/2020
Corrections complete to fire caulking issues on third floor south.

Progress Inspection Passed 7/20/2020 (8:00 - 10:00) 7/20/2020 (AM) 07/22/2020
Corrections:


Miscellaneous/Other
Resolved
07/22/2020
Fire caulking corrections required in units 306, 307, 308, 312 and 313. Future fire caulking inspections will require that all wall cavities be swept clear of debris. Reinspection of these units required.

Progress Inspection Passed 7/24/2020 (8:00 - 10:00) 7/24/2020 (AM) 07/24/2020
Corrections:


Miscellaneous/Other
Comment Only
07/24/2020
Framing and fire caulking of rooms along connecting corridor on third floor approved.

Progress Inspection Passed 7/27/2020 (8:00 - 10:00) 7/27/2020 (AM) 07/27/2020
Corrections:


Miscellaneous/Other
Comment Only
07/27/2020
Insulation in units on south end of third floor approved.

Progress Inspection Passed 7/29/2020 (8:00 - 10:00) 7/29/2020 (AM) 07/29/2020
Corrections:


Miscellaneous/Other
Comment Only
07/29/2020
Insulation in units along central corridor of third-floor approved.

Progress Inspection Passed 7/31/2020 (8:00 - 10:00) 7/31/2020 (AM) 07/31/2020
Corrections:


Miscellaneous/Other
Comment Only
07/31/2020
Framing and fire caulking on South wing of second floor approved.

Progress Inspection Passed 8/5/2020 (8:00 - 10:00) 8/5/2020 (AM) 08/05/2020
Corrections:


Miscellaneous/Other
Comment Only
08/05/2020
Insulation at south end of second floor units approved.

Progress Inspection Passed 8/6/2020 (8:00 - 10:00) 8/6/2020 (AM) 08/06/2020
Corrections:


Miscellaneous/Other
Comment Only
08/06/2020
Framing and fire caulking on connection units on second floor approved.

Progress Inspection Passed 8/10/2020 (8:00 - 10:00) 8/10/2020 (AM) 08/11/2020
Corrections:


Miscellaneous/Other
Comment Only
08/11/2020
Insulation in units on second floor connecting Corredor approved.

Progress Inspection Partial Pass 8/14/2020 (8:00 - 10:00) 8/14/2020 (AM) 08/14/2020
Corrections:


Miscellaneous/Other
Comment Only
08/14/2020
Portion of units in south east corner of first floor requiring framing and fire caulking approval are approved were noted on door. Some units still under general construction and one not approved by fire are yet to be approved. Recessed ceiling above entries two units to have complete fire blocking ready for inspection and insulation inspection.

Progress Inspection Passed 8/17/2020 (8:00 - 10:00) 8/17/2020 (AM) 08/18/2020
Corrections:


Miscellaneous/Other
Comment Only
08/18/2020
Progress inspection of stucco lath on south end of East wall approved.

Progress Inspection Passed 8/19/2020 (8:00 - 10:00) 8/19/2020 (AM) 08/19/2020
Corrections:


Miscellaneous/Other
Comment Only
08/19/2020
Insulation in first level memory care units approved.

Progress Inspection Passed 8/24/2020 (8:00 - 10:00) 8/24/2020 (AM) 08/24/2020
Corrections:


Miscellaneous/Other
Comment Only
08/24/2020
Framing and fire caulking approved in offices and miscellaneous rooms in south end of first floor.

Progress Inspection Passed 8/28/2020 (8:00 - 10:00) 8/28/2020 (AM) 08/28/2020
Corrections:


Miscellaneous/Other
Comment Only
08/28/2020
Insulation on first floor west end of sole wing approved. First floor miscellaneous rooms and south wing fire caulking and framing approved. Progress on rated mechanical shafts approved. Progress inspection of lath on east side of building approved.

Progress Inspection Passed 8/31/2020 (8:00 - 10:00) 8/31/2020 (AM) 09/01/2020
Corrections:


Miscellaneous/Other
Comment Only
09/01/2020
Framing and fire caulking of rooms on east side of middle corridor on first floor approved.

Progress Inspection Passed 9/2/2020 (8:00 - 10:00) 9/2/2020 (AM) 09/02/2020
Corrections:


Miscellaneous/Other
Comment Only
09/02/2020
Progress inspection on rated shaft approved. Insulation on east side of center corridor on first floor approved.

Progress Inspection Passed 9/4/2020 (8:00 - 10:00) 9/4/2020 (AM) 09/04/2020
Corrections:


Miscellaneous/Other
Comment Only
09/04/2020
Framing and fire caulking of units on north wing of fourth floor approved.

Progress Inspection Passed 9/9/2020 (8:00 - 10:00) 9/9/2020 (AM) 09/09/2020
Corrections:


Miscellaneous/Other
Comment Only
09/09/2020
Insulation of units in north wing of fourth floor approved. Progress inspection on rated shafts approved. Call for inspection of rated stairwell shafts when ready.

Progress Inspection Passed 9/11/2020 (8:00 - 10:00) 9/11/2020 (AM) 09/11/2020
Corrections:


Miscellaneous/Other
Comment Only
09/11/2020
Progress on rated shaft approved. Framing and fire caulking in units on third floor in north wing approved.

Progress Inspection Passed 9/16/2020 (8:00 - 10:00) 9/16/2020 (AM) 09/17/2020
Corrections:


Miscellaneous/Other
Comment Only
09/17/2020
Insulation in units on North wing, third floor approved.

Miscellaneous/Other
Comment Only
10/29/2020
Remaining framing and fire caulking on first floor approved on October 29.

Progress Inspection Failed 9/21/2020 (8:00 - 10:00) 9/21/2020 (AM) 09/21/2020
Corrections:


Miscellaneous/Other
Carried Forward
10/29/2020
Progress inspection of laugh on west side of building OK. Call for remaining laugh inspection when done. Framing and fire caulking inspection on north wing of second floor not approved. Fire blocking required at tops of voids inrooms 271, 280 and 227. Wiring penetrations in top plates need corrections in room 272 and 275. Reinspection required.

Progress Inspection Passed 9/24/2020 (8:00 - 10:00) 9/24/2020 (AM) 09/24/2020
Corrections:


Miscellaneous/Other
Comment Only
09/24/2020
Insulation in second floor units on north wing approved. Insulation in first floor dining area approved. Framing and fire caulking approved in kitchen contingent on plumbing approval. Pad footing with rebar for monument sign as per plan approved.

Progress Inspection Passed 9/30/2020 (8:00 - 10:00) 9/30/2020 (AM) 09/30/2020
Corrections:


Miscellaneous/Other
Comment Only
09/30/2020
Framing and fire caulking of units on first floor, north wing approved. Exterior insulation in first floor kitchen area approved. Progress inspection on elevator shaft approved.

Progress Inspection Passed 10/2/2020 (8:00 - 10:00) 10/2/2020 (AM) 10/02/2020
Corrections:


Miscellaneous/Other
Comment Only
10/02/2020
Progress inspection of remaining elevator shaft and stairwell OK. Insulation on first floor units in north wing approved.

Insulation Inspection Passed 7/8/2020 7/8/2020 (AM) 11/03/2020
Corrections:


Miscellaneous/Other
Comment Only
11/03/2020
Insulation of remaining units on first floor approved.

Progress Inspection Partial Pass 11/19/2020 (10:00 - 12:00) 11/19/2020 (AM) 11/19/2020
Corrections:


Miscellaneous/Other
Comment Only
11/19/2020
Progress inspection on exterior to discuss requirements for final inspection and occupancy needed at a later date

Progress Inspection Passed 1/7/2021 (12:30 - 2:30) 1/7/2021 (PM) 01/08/2021
Corrections:


Miscellaneous/Other
Comment Only
01/08/2021
Meeting on January 8 with contractor to review signage plan and answer signage questions.

Progress Inspection Passed 1/21/2021 (12:30 - 2:30) 1/21/2021 (PM) 01/21/2021
Corrections:


Miscellaneous/Other
Comment Only
01/21/2021
Pre-final walk-through, confirmed all guard rails on decks at fourth floor approved.

Progress Inspection Passed 2/17/2021 (12:30 - 2:30) 2/17/2021 (PM) 02/17/2021
Corrections:


Miscellaneous/Other
Comment Only
02/17/2021
Progress inspection to confirm approval of deck guard rails on second level approved.

Progress Inspection Passed w/ Conditions 2/22/2021 (12:30 - 2:30) 2/22/2021 (PM) 02/23/2021
Corrections:


Miscellaneous/Other
Comment Only
02/23/2021
Reviewed fire caulking in garage ceiling. One penetration missing fire caulk, correct as required.

Progress Inspection Passed 3/3/2021 (10:00 - 12:00) 3/3/2021 (AM) 03/03/2021
Corrections:


Miscellaneous/Other
Comment Only
03/03/2021
Progress inspection of final issues on main level show ADA requirements OK, exiting requirements OK. Complete fire caulking of remaining few penetrations in garage level ceiling as required.

Fire Inspection Final Not Ready 3/4/2021 (8:00 - 10:00) 3/4/2021 (AM) 03/04/2021
Corrections:


Miscellaneous/Other
Carried Forward
04/05/2021
413, 416, 330, 327, 307, 301, 214, 277, door not closing and latching. Sign package for room numbers directional. 103 kitchen smoke bad. Add fire extinguisher near public stove. Label key switch that drops mag doors in vestibule. Provide site plan in vestibule with room numbers and says sprinkler control valves located in parking garage by stair D. Provide no parking signage in drive areas. Provide emergency lighting in common areas on the first floor west side.

Progress Inspection Passed 3/8/2021 (10:00 - 12:00) 3/8/2021 (AM) 03/08/2021
Corrections:


Miscellaneous/Other
Comment Only
03/08/2021
Progress inspection for pre-final, in garage area, complete installation of bollards and handicap signage as required.

Building Final Inspection Issue TCO 3/10/2021 (10:00 - 12:00) 3/10/2021 (AM) 03/10/2021
Corrections:


Miscellaneous/Other
Carried Forward
03/10/2021
Complete final landscaping and parking lot topping with striping. Provide Final as built drawings to engineering. Complete items requested by fire inspector. 90 day temporary CO approved.

Fire Inspection Final Passed 3/9/2021 (12:30 - 2:30) 3/9/2021 (PM) 04/09/2021
Corrections:


Miscellaneous/Other
Outstanding
03/04/2021
413, 416, 330, 327, 307, 301, 214, 277, door not closing and latching. Sign package for room numbers directional. 103 kitchen smoke bad. Add fire extinguisher near public stove. Label key switch that drops mag doors in vestibule. Provide site plan in vestibule with room numbers and says sprinkler control valves located in parking garage by stair D. Provide no parking signage in drive areas. Provide emergency lighting in common areas on the first floor west side.

Fire Inspection Final Passed 4/6/2021 (7:00 - 8:00) 4/6/2021 (AM) 04/20/2021
Corrections:


Miscellaneous/Other
Outstanding
04/05/2021
413, 416, 330, 327, 307, 301, 214, 277, door not closing and latching. Sign package for room numbers directional. 103 kitchen smoke bad. Add fire extinguisher near public stove. Label key switch that drops mag doors in vestibule. Provide site plan in vestibule with room numbers and says sprinkler control valves located in parking garage by stair D. Provide no parking signage in drive areas. Provide emergency lighting in common areas on the first floor west side.

Building Final Inspection Passed 5/19/2021 (12:30 - 2:30) 5/19/2021 (PM) 05/19/2021
Corrections:


Miscellaneous/Other
Resolved
05/19/2021
Complete final landscaping and parking lot topping with striping. Provide Final as built drawings to engineering. Complete items requested by fire inspector. 90 day temporary CO approved.