Permit Application Status

PRBD201913895


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201913895
Building
Expired
GKII NORTHLAND CENTER LLC
Alteration/Repair/Replace
Not Required
6th Floor Elevator lobby finishes. Replace ceiling panels with gypsum drywall and new light fixtures.
11/13/2019
11/15/2019
12/12/2020

Locations

Permits

Permit Number: PRBD201913895

Building
Expired
11/15/2019
12/12/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Building Final Inspection Pending
Corrections:


Miscellaneous/Other
Outstanding
02/24/2020
Final - failed. A. NO TRADE ROUGH IN INSPECTIONS ABOVE NEW HARD LID CEILING WERE REQUESTED.BY CONTRACTORS. B. REINSPECTION FEES WILL NOW APPLY FOR ALL TRADE REINSPECTIONS, AND BUILDING REINSPECTIONS. 2/24/20 B. POST, Sr. General inspector.

Electrical Rough-in Inspection Pending
Framing Inspection Partial Pass 1/17/2020 (8:00 - 10:00) 1/17/2020 (AM) 01/17/2020
6th floor elevator lobby. A. Framing of new ceiling - replacing ceiling tile with gypsum ceiling and new recessed lights. Existing ceiling has smoke detector, fire alarm warning wall indication device. B. Need above ceiling inspections for electrical rough in, and new fire sprinkler locations above ceiling inspection.
Fire Inspection Final Failed 2/24/2020 (10:00 - 12:00) 2/24/2020 (AM) 02/24/2020
Corrections:


Miscellaneous/Other
Outstanding
02/24/2020
No sprinkler inspection completed.

Framing Inspection Failed 02/24/2020
Inspector had passed today framing partial pass, contingent upon contractor providing all trade rough in inspections. A. No trade rough in inspections were attained on permit card on site. B. REINSPECTION FEES WILL NOW APPLY PER BUILDING INSPECTOR.
Corrections:


Miscellaneous/Other
Comment Only
02/24/2020
Final - failed. A. Above ceiling for electrical, fire sprinkler, low voltage, not indicated by permit card on site. B. NO CITY STAMPED BLUEPRINT ON SITE. C. No emergency lighting from new style exit sign. If on generator circuit, need to test generator. D. Additional reinspection fees will now apply. for all city trade inspections or reinspection.

Building Final Inspection Failed 2/24/2020 (10:00 - 12:00) 2/24/2020 (AM) 02/24/2020
Corrections:


Miscellaneous/Other
Carried Forward
02/24/2020
Final - failed. A. NO TRADE ROUGH IN INSPECTIONS ABOVE NEW HARD LID CEILING WERE REQUESTED.BY CONTRACTORS. B. REINSPECTION FEES WILL NOW APPLY FOR ALL TRADE REINSPECTIONS, AND BUILDING REINSPECTIONS. 2/24/20 B. POST, Sr. General inspector.

Framing Inspection Passed 06/08/2020
Framing passed, but no electrical rough in inspection was requested, need fire inspection final.
Fire Inspection Final Passed 6/15/2020 (8:00 - 10:00) 6/15/2020 (AM) 06/15/2020
Corrections:


Miscellaneous/Other
Outstanding
02/24/2020
No sprinkler inspection completed.