PRBD201913895
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Building Final Inspection | Pending | |||
Corrections:
Miscellaneous/Other
Outstanding
02/24/2020
Final - failed. A. NO TRADE ROUGH IN INSPECTIONS ABOVE NEW HARD LID CEILING WERE REQUESTED.BY CONTRACTORS. B. REINSPECTION FEES WILL NOW APPLY FOR ALL TRADE REINSPECTIONS, AND BUILDING REINSPECTIONS. 2/24/20 B. POST, Sr. General inspector.
|
||||
Electrical Rough-in Inspection | Pending | |||
Framing Inspection | Partial Pass | 1/17/2020 (8:00 - 10:00) | 1/17/2020 (AM) | 01/17/2020 |
6th floor elevator lobby. A. Framing of new ceiling - replacing ceiling tile with gypsum ceiling and new recessed lights. Existing ceiling has smoke detector, fire alarm warning wall indication device. B. Need above ceiling inspections for electrical rough in, and new fire sprinkler locations above ceiling inspection. | ||||
Fire Inspection Final | Failed | 2/24/2020 (10:00 - 12:00) | 2/24/2020 (AM) | 02/24/2020 |
Corrections:
Miscellaneous/Other
Outstanding
02/24/2020
No sprinkler inspection completed.
|
||||
Framing Inspection | Failed | 02/24/2020 | ||
Inspector had passed today framing partial pass, contingent upon contractor providing all trade rough in inspections. A. No trade rough in inspections were attained on permit card on site. B. REINSPECTION FEES WILL NOW APPLY PER BUILDING INSPECTOR. | ||||
Corrections:
Miscellaneous/Other
Comment Only
02/24/2020
Final - failed. A. Above ceiling for electrical, fire sprinkler, low voltage, not indicated by permit card on site. B. NO CITY STAMPED BLUEPRINT ON SITE.
C. No emergency lighting from new style exit sign. If on generator circuit, need to test generator. D. Additional reinspection fees will now apply. for all city trade inspections or reinspection.
|
||||
Building Final Inspection | Failed | 2/24/2020 (10:00 - 12:00) | 2/24/2020 (AM) | 02/24/2020 |
Corrections:
Miscellaneous/Other
Carried Forward
02/24/2020
Final - failed. A. NO TRADE ROUGH IN INSPECTIONS ABOVE NEW HARD LID CEILING WERE REQUESTED.BY CONTRACTORS. B. REINSPECTION FEES WILL NOW APPLY FOR ALL TRADE REINSPECTIONS, AND BUILDING REINSPECTIONS. 2/24/20 B. POST, Sr. General inspector.
|
||||
Framing Inspection | Passed | 06/08/2020 | ||
Framing passed, but no electrical rough in inspection was requested, need fire inspection final. | ||||
Fire Inspection Final | Passed | 6/15/2020 (8:00 - 10:00) | 6/15/2020 (AM) | 06/15/2020 |
Corrections:
Miscellaneous/Other
Outstanding
02/24/2020
No sprinkler inspection completed.
|