PRBD201914019
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Framing Inspection | Passed | 12/12/2019 (10:00 - 12:00) | 12/12/2019 (AM) | 12/12/2019 |
| 3rd floor - complete floor spec suite - already final approved. A. New work - Install an IT room, for new future tenant. B. Framing approved. C. Electrical permit required. | ||||
| Fire Inspection Final | Passed | 01/02/2020 | ||
| PREVIOUS complete total floor space buildout under previous building permit. A . EXISTING SPRINKLER HEAD COVERAGE IN I.T. CLOSET WITH OUT CEILING TILES. B. NO NEW SPRINKLER WORK. | ||||
| Building Final Inspection | Passed | 01/02/2020 | ||
| FINAL - Walls for I.T room, in previous finished total floor build out. PASSED. A. ELECTRICAL PERMIT AND FINAL REQUIRED FOR LOW VOLTAGE DATA WIRING. | ||||