PRBD201914504
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Footing Inspection | Partial Pass | 3/3/2020 (10:00 - 12:00) | 3/3/2020 (AM) | 03/03/2020 |
Corrections:
Miscellaneous/Other
Outstanding
03/03/2020
Slab on metal deck level one .. section is in progress of rebar placement, designer and special inspection is also looking at this and upon their approval, concrete placement can take place.
|
||||
Footing Inspection | Partial Pass | 3/4/2020 (10:00 - 12:00) | 3/4/2020 (AM) | 03/04/2020 |
Corrections:
Miscellaneous/Other
Comment Only
03/04/2020
Rebar for 5 ft. High wall.. approved
|
||||
Footing Inspection | Not Ready | 3/5/2020 (10:00 - 12:00) | 3/5/2020 (AM) | 03/05/2020 |
Corrections:
Miscellaneous/Other
Comment Only
03/05/2020
Not ready for inspection
|
||||
Framing Inspection | Partial Pass | 3/9/2020 (10:00 - 12:00) | 3/9/2020 (AM) | 03/09/2020 |
Corrections:
Miscellaneous/Other
Comment Only
03/09/2020
Footings for area well on S.W. end... approved.
|
||||
Framing Inspection | Partial Pass | 3/10/2020 (10:00 - 12:00) | 3/10/2020 (AM) | 03/10/2020 |
Corrections:
Miscellaneous/Other
Comment Only
03/10/2020
Viewed waffle slab progress, rebar is being installed as per the plan design. Imbeds to go in after all bar is in, and then all bar will be chaired to maintain clearance to forms.
|
||||
Framing Inspection | Partial Pass | 3/11/2020 (10:00 - 12:00) | 3/11/2020 (AM) | 03/11/2020 |
Corrections:
Miscellaneous/Other
Comment Only
03/11/2020
Progress of waffle deck: some rebar still needed at East beam and in the SW locations where it is incomplete. Imbeds are being installed and chairing of rebar to take place when all rebar and imbeds are in place.
Metal decks: rebar is in process of installation, some small detail work is yet to be done.
Special inspection and engineer to view as well prior to concrete placement. Special inspection reports to be submitted to city for all work on this project that they look at... submit reports by email to inspector.
|
||||
Framing Inspection | Partial Pass | 3/12/2020 (10:00 - 12:00) | 3/12/2020 (AM) | 03/13/2020 |
Corrections:
Miscellaneous/Other
Comment Only
03/13/2020
Rebar approved for Waffle slab, Metal decks. And wall at area well. Approved for concrete placement
|
||||
Progress Inspection | Partial Pass | 03/16/2020 | ||
Corrections:
Miscellaneous/Other
Comment Only
03/16/2020
Two sections of slab on grade with under slab poly and rebar located at the west end of building. Approved for concrete placement
|
||||
Framing Inspection | Partial Pass | 04/30/2020 | ||
Corrections:
Miscellaneous/Other
Comment Only
04/30/2020
Partial wall framing interior... framing , spacer bars, and sheet metal covering, and fasteners... approved
Firestops at piping at building separation wall... approved
|
||||
Progress Inspection | Partial Pass | 08/13/2020 | ||
Corrections:
Miscellaneous/Other
Comment Only
08/13/2020
Door rating at room 243 (electrical room) is 90 minutes and verified by the embossed stamp that will be covered with a continuous hinge.
|
||||
Building Final Inspection | Partial Pass | 8/28/2020 (10:00 - 12:00) | 8/28/2020 (AM) | 08/28/2020 |
Corrections:
Miscellaneous/Other
Carried Forward
08/28/2020
Corrections to be completed for final...
1) penetrations in rated walls to be firestopped on both sides of walls.
2) floor penetrations to be firestopped
3) draftstopping where floors meet walls to be completed,
4) as per Mn. Building Code 2015 section 704.9... fire protected columns that are subject to impact damage need to have a protective covering around them for a height of 5ft. Minimum to protect the fireproofing.
5) complete exterior work of building and landscaping.
|
||||
Miscellaneous/Other
Comment Only
08/28/2020
See outstanding comments for corrections that are to be viewed prior to or at final.
EM lighting, exiting, and signage inspected and approved.
Temp occupancy is approved
|
||||
Fire Inspection Final | Partial Pass | 8/28/2020 (10:00 - 12:00) | 8/28/2020 (AM) | 09/01/2020 |
Building Final Inspection | Passed | 10/9/2020 (8:00 - 10:00) | 10/9/2020 (AM) | 10/09/2020 |
Corrections:
Miscellaneous/Other
Resolved
10/09/2020
Corrections to be completed for final...
1) penetrations in rated walls to be firestopped on both sides of walls.
2) floor penetrations to be firestopped
3) draftstopping where floors meet walls to be completed,
4) as per Mn. Building Code 2015 section 704.9... fire protected columns that are subject to impact damage need to have a protective covering around them for a height of 5ft. Minimum to protect the fireproofing.
5) complete exterior work of building and landscaping.
|
||||
Miscellaneous/Other
Comment Only
10/09/2020
All corrections are completed. Parking accessibility is approved, and bike rack installed and landscaping completed all soil retainage systems have been pulled.
|
||||
Fire Inspection Final | Partial Pass | 10/9/2020 (8:00 - 10:00) | 10/9/2020 (AM) | 10/09/2020 |
Miscellaneous/Other Temp C/O approved. Final pending installation on emergency responder radio coverage equipment installation. |