PRBD201914939
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Partial Pass | 07/16/2020 | ||
Corrections:
Miscellaneous/Other
Comment Only
07/16/2020
Framing... kids dressing rooms, storefront, hard lid, and walls of the 1st phase of remodel. Approved
|
||||
Framing Inspection | Partial Pass | 7/21/2020 (7:00 - 8:00) | 7/21/2020 (AM) | 07/21/2020 |
Corrections:
Miscellaneous/Other
Comment Only
07/21/2020
Consultation with contractor.
Existing loading door is going to stay, the exit sign to this door was not supposed to be there and was removed, holes in rated wall to be patched by drywall contractor.
The fireproofing at the one column that is now covered has been patched to the existing coverage rating with Cafco Blaze Shield.
Call in for inspections as needed and work progresses.
|
||||
Progress Inspection | Partial Pass | 8/3/2020 (7:00 - 8:00) | 8/3/2020 (AM) | 08/03/2020 |
Corrections:
Miscellaneous/Other
Comment Only
08/03/2020
Phase 1 of fitting rooms approved for turnover and public use. EM lighting for this space approved. Electrical approval pending for this area.
|
||||
Progress Inspection | Passed | 8/10/2020 (12:30 - 2:30) | 8/10/2020 (PM) | 08/10/2020 |
Corrections:
Miscellaneous/Other
Comment Only
08/10/2020
Phase 4 of project... wall and ceiling framing, above ceiling and storefront...approved.
Leave access for fire inspection to see above ceiling for sprinkler inspection.
|
||||
Building Final Inspection | Failed | 09/11/2020 | ||
Corrections:
Miscellaneous/Other
Carried Forward
09/11/2020
1) all trades inspections are needed to be performed and final to obtain the building final for this project.
|
||||
Miscellaneous/Other
Comment Only
09/11/2020
New cashwrap meets accessibility
See outstanding comments , call in for all inspection finals.final for this permit cannot be approved at this time.
|
||||
Fire Inspection Final | Passed | 10/05/2020 | ||
Corrections:
Miscellaneous/Other
Comment Only
10/05/2020
Final approved per fire inspector Kris K.
|
||||
Building Final Inspection | Passed | 10/05/2020 | ||
Corrections:
Miscellaneous/Other
Resolved
10/05/2020
1) all trades inspections are needed to be performed and final to obtain the building final for this project.
|
||||
Miscellaneous/Other
Comment Only
10/05/2020
All trades finals completed. Final for this permit approved.
|