Permit Application Status

PRBD201914988


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD201914988
Building
Expired
BLN OFFICE PARK ASSOC II
Alteration/Repair/Replace
Not Required
Alterations to office/restroom Amerihealth
12/16/2019
01/10/2020
08/22/2020

Locations

Permits

Permit Number: PRBD201914988

Building
Expired
01/10/2020
08/22/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Fire Inspection Final Pending
Building Final Inspection Pending
Corrections:


Miscellaneous/Other
Outstanding
02/24/2020
1) install accessibility signage at front of room entry. 2) install coat hook at accessibility height of 48” max height, ( existing hook is to high for accessibility). 3) provide verification of firestop at toilet flange and any other water, or drain piping that needs to be viewed from the suite below the bathroom. Provide pictures or se up inspection with coordination with the tennant below the where this bathroom conversion is.

Building Final Inspection Partial Pass 2/24/2020 (10:00 - 12:00) 2/24/2020 (AM) 02/24/2020
Corrections:


Miscellaneous/Other
Comment Only
02/24/2020
Sitting room was converted to a accessible bathroom...we outstanding comments on items needed to be verified for the final. Fire inspection is not required for this project, all safety features were previously installed and inspected with the prior buildout.

Miscellaneous/Other
Carried Forward
02/24/2020
1) install accessibility signage at front of room entry. 2) install coat hook at accessibility height of 48” max height, ( existing hook is to high for accessibility). 3) provide verification of firestop at toilet flange and any other water, or drain piping that needs to be viewed from the suite below the bathroom. Provide pictures or se up inspection with coordination with the tennant below the where this bathroom conversion is.