PRBD202000194
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Passed | 2/5/2020 (10:00 - 12:00) | 2/5/2020 (AM) | 02/05/2020 |
Corrections:
Miscellaneous/Other
Comment Only
02/05/2020
Partition walls only, no plumbing or electrical in walls. Contractor to fasten studs to the square posts and take pictures for inspection. Approved to cover walls , pictures to be shown to inspector.
|
||||
Building Final Inspection | Partial Pass | 3/6/2020 (10:00 - 12:00) | 3/6/2020 (AM) | 03/06/2020 |
Corrections:
Miscellaneous/Other
Comment Only
03/06/2020
Approved for temp and to open to public pending a reinspection of 2 added directional exit lights and tapering of raised floor in the back shell area for floor height of path of travel.
|
||||
Fire Inspection Final | Passed | 3/6/2020 (7:00 - 8:00) | 3/6/2020 (AM) | 03/06/2020 |
Building Final Inspection | Passed | 3/11/2020 (8:00 - 10:00) | 3/11/2020 (AM) | 03/11/2020 |
Corrections:
Miscellaneous/Other
Comment Only
03/11/2020
Directional exit signs installed and transitions at floor completed...Final approved
|