PRBD202000230
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Fire Inspection Final | Pending | |||
Framing Inspection | Partial Pass | 1/29/2020 (12:30 - 2:30) | 1/29/2020 (PM) | 01/29/2020 |
Framing - Park and Rec Division. A. metal studs for workroom walls to deck with a revision to add window in north wall. Removable ceiling tile ceiling. B. Provide electrical wall Rough-in inspection prior to covering. | ||||
Building Final Inspection | Passed | 2/21/2020 (10:00 - 12:00) | 2/21/2020 (AM) | 02/21/2020 |
Need fire sprinkler modification permit above ceiling inspection, and final. Electric permit has passed. Building permit has passed today. | ||||
Fire Inspection Final | Not Ready | 2/21/2020 (10:00 - 12:00) | 2/21/2020 (AM) | 02/21/2020 |
Fire Inspection Final | Passed | 2/24/2020 (2:30 - 3:30) | 2/24/2020 (PM) | 02/24/2020 |