Summary

PRBD202000585
Building
Finaled
BLN OFFICE PARK PROPERTIES
Alteration/Repair/Replace
Not Required
Remodel an office existing space for a new tenant Ste 311 EN Engineering
01/21/2020
01/28/2020
01/09/2021
07/13/2020

Locations

Permits

Permit Number: PRBD202000585

Building
Finaled
01/28/2020
01/09/2021

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 2/28/2020 (8:00 - 10:00) 2/28/2020 (AM) 02/28/2020
Corrections:


Miscellaneous/Other
Comment Only
02/28/2020
Wall framing approved. Reinspection of plumbing firestops needed, call and a Schedule inspection

Framing Inspection Partial Pass 3/30/2020 (8:00 - 10:00) 3/30/2020 (AM) 03/30/2020
Corrections:


Miscellaneous/Other
Carried Forward
03/30/2020
Reinspection of firestops needed at electrical through floor in grey room by diffuser, and electrical feed near windows.

Miscellaneous/Other
Comment Only
03/30/2020
Ceiling framing and above ceiling, approved to pad out pending reinspection of the outstanding firestops.

Fire Rating Inspection Passed 3/31/2020 (10:00 - 12:00) 3/31/2020 (AM) 03/31/2020
Corrections:


Miscellaneous/Other
Resolved
03/31/2020
Reinspection of firestops needed at electrical through floor in grey room by diffuser, and electrical feed near windows.

Miscellaneous/Other
Comment Only
03/31/2020
Are you stops completed, OK to pad out ceiling.

Fire Inspection Final Failed 6/11/2020 (8:00 - 10:00) 6/11/2020 (AM) 06/11/2020
Corrections:


Miscellaneous/Other
Outstanding
06/11/2020
Space needs fire alarm notification appliances. Need sprinkler rough in (above ceiling) and final inspections. Not approved for occupancy until life safety issues are resolved.

Building Final Inspection Failed 6/11/2020 (8:00 - 10:00) 6/11/2020 (AM) 06/11/2020
Corrections:


Miscellaneous/Other
Comment Only
06/11/2020
Final not approved. Fire sprinkler inspection was not done or called in. Complete inspection and install fire alarm notification devices. Reschedule final for this space when these issues are completed.

Building Final Inspection Failed 7/9/2020 (10:00 - 12:00) 7/9/2020 (AM) 07/09/2020
Cancellation by contractor today. jsmidt 07/09/2020 8:19 AM
Corrections:


Miscellaneous/Other
Comment Only
07/09/2020
Inspection canceled due to not passing fire inspection. Call and set up final inspection with fire and building when issues with system are resolved.

Building Final Inspection Passed 7/13/2020 (8:00 - 10:00) 7/13/2020 (AM) 07/13/2020
Corrections:


Miscellaneous/Other
Comment Only
07/13/2020
Final approved, ok to occupy space.

Fire Inspection Final Passed 07/13/2020
Corrections:


Miscellaneous/Other
Resolved
07/13/2020
Space needs fire alarm notification appliances. Need sprinkler rough in (above ceiling) and final inspections. Not approved for occupancy until life safety issues are resolved.