Permit Application Status

PRBD202000820


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202000820
Building
Permit(s) Issued
DRFC METRO LLC
Alteration/Repair/Replace
Not Required
Downsize
01/28/2020
02/20/2020
12/16/2021

Locations

Permits

Permit Number: PRBD202000820

Building
Expired
02/20/2020
11/16/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Fire Inspection Final Pending
Corrections:


Inadequate fire alarm coverage.
Outstanding
05/20/2020
Inadequate fire alarm coverage. Add notification appliance in new areas.

Framing Inspection Partial Pass 2/28/2020 (12:30 - 2:30) 2/28/2020 (PM) 02/28/2020
Corrections:


Miscellaneous/Other
Comment Only
02/28/2020
Wall framing on the first phase approved. Leave open the 2 ceiling tiles (located by the plumbing) to view firestops at floor above, for the next inspection.

Framing Inspection Passed 4/9/2020 (2:30 - 3:30) 4/9/2020 (PM) 04/09/2020
Corrections:


Miscellaneous/Other
Comment Only
04/09/2020
Phase 2 wall framing at 4th floor... approved.

Above Ceiling Inspection Passed 4/30/2020 (12:30 - 2:30) 4/30/2020 (PM) 04/30/2020
Corrections:


Miscellaneous/Other
Comment Only
04/30/2020
Above ceiling approved pending electrical corrections and reinspection by electrical inspector

Fire Inspection Final Failed 5/20/2020 (10:00 - 12:00) 5/20/2020 (AM) 05/20/2020
Corrections:


Inadequate fire alarm coverage.
Outstanding
05/20/2020
Inadequate fire alarm coverage. Add notification appliance in new areas.

Building Final Inspection Passed w/ Conditions 5/20/2020 (10:00 - 12:00) 5/20/2020 (AM) 05/20/2020
Corrections:


Miscellaneous/Other
Comment Only
05/20/2020
Fire alarm notification devices needed in the separated new area. Building final approved with conditions and pending fire inspection follow up.