PRBD202002275
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Framing Inspection | Partial Pass | 5/15/2020 (12:30 - 2:30) | 5/15/2020 (PM) | 05/15/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
05/15/2020
Wall framing approved see outstanding comments for corrections.
|
||||
|
Miscellaneous/Other
Carried Forward
05/15/2020
Hole in concrete floor by shaft to be patched with an approved firestop, and hole in shaft at same location as floor hole to also be patched d and rated for 2hr. Rating.
Call for the inspection of these repairs.
|
||||
| Framing Inspection | Passed w/ Conditions | 5/28/2020 (8:00 - 10:00) | 5/28/2020 (AM) | 05/28/2020 |
|
Corrections:
Miscellaneous/Other
Resolved
05/28/2020
Hole in concrete floor by shaft to be patched with an approved firestop, and hole in shaft at same location as floor hole to also be patched d and rated for 2hr. Rating.
Call for the inspection of these repairs.
|
||||
|
Miscellaneous/Other
Comment Only
05/28/2020
Above ceiling approved, with firestops to be completed and viewed at 3locations.
|
||||
|
Miscellaneous/Other
Outstanding
05/28/2020
Firestops to be completed at three locations, and removal of form boards at concrete.
|
||||
| Building Final Inspection | Passed w/ Conditions | 8/6/2020 (12:30 - 2:30) | 8/6/2020 (PM) | 08/06/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
08/06/2020
Board room is not going to be used as a 7 sq. Ft. Standing room occupant load. It is set up to have a use of under 50 occupancy load and will not need exit signage or panic/ push bar door hardware.
This room is compliant as it is set up and approved for use.
The space is also compliant for use, and meets code requirements.
|
||||
|
Miscellaneous/Other
Comment Only
08/06/2020
Board room is not going to be used as a 7 sq. Ft. Standing room occupant load. It is set up to have a use of under 50 occupancy load and will not need exit signage or panic/ push bar door hardware.
This room is compliant as it is set up and approved for use.
The space is also compliant for use, and meets code requirements.
The project manager is to contact the architect and have them send an addendum for the use and occupant load of this room to the city for our record of change and use of this room.
This is a condition to be met to final this permit.
|
||||
| Fire Inspection Final | Passed | 8/6/2020 (12:30 - 2:30) | 8/6/2020 (PM) | 08/07/2020 |