PRBD202002802
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Passed | 8/4/2020 (10:00 - 12:00) | 8/4/2020 (AM) | 08/04/2020 |
Added time for taking temp and access for COVID screening. | ||||
Corrections:
Miscellaneous/Other
Comment Only
08/04/2020
Footings for two stoops approved.
|
||||
Framing Inspection | Passed | 8/6/2020 (8:00 - 10:00) | 8/6/2020 (AM) | 08/06/2020 |
Corrections:
Miscellaneous/Other
Comment Only
08/06/2020
Framing of will call room walls approved. New office demising wall on column line B approved to cover one side only until electrical rough in approved.
|
||||
Footing Inspection | Passed | 9/9/2020 (12:30 - 2:30) | 9/9/2020 (PM) | 09/09/2020 |
Corrections:
Miscellaneous/Other
Comment Only
09/09/2020
20“ x 12“ strip footings with two, number four rebar on sandy soil approved.
|
||||
Framing Inspection | Passed | 9/9/2020 (12:30 - 2:30) | 9/9/2020 (PM) | 09/09/2020 |
Corrections:
Miscellaneous/Other
Comment Only
09/09/2020
Demising wall framing approved. Note, no electrical in this wall.
|
||||
Framing Inspection | Passed | 9/18/2020 (12:30 - 2:30) | 9/18/2020 (PM) | 09/18/2020 |
Corrections:
Miscellaneous/Other
Comment Only
09/18/2020
Phase 3 progress on framing includes IT room, approved.
|
||||
Framing Inspection | Partial Pass | 9/30/2020 (8:00 - 10:00) | 9/30/2020 (AM) | 09/30/2020 |
Framing - Balance of Standard framed tall walls - steel stud, with top deflection deep leg track. Passed. Ongoing work partial pass. | ||||
Framing Inspection | Passed | 10/27/2020 (10:00 - 12:00) | 10/27/2020 (AM) | 10/27/2020 |
Corrections:
Miscellaneous/Other
Comment Only
10/27/2020
Additional miscellaneous wall framing approved.
|
||||
Framing Inspection | Passed | 12/9/2020 (8:00 - 10:00) | 12/9/2020 (AM) | 12/09/2020 |
Corrections:
Miscellaneous/Other
Comment Only
12/09/2020
Final framing inspection of framed suspended ceiling OK. Contractor to confirm compliance with engineered support system.
|
||||
Fire Inspection Final | Partial Pass | 1/19/2021 (12:30 - 2:30) | 1/19/2021 (PM) | 01/19/2021 |
Building Final Inspection | Failed | 1/19/2021 (12:30 - 2:30) | 1/19/2021 (PM) | 01/19/2021 |
Corrections:
Miscellaneous/Other
Carried Forward
01/19/2021
1. Provide cane guard at drinking fountain in corridor. 2. Provide vertical grab bars in ambulatory stall. 3. Provide five exit lights as directed in field. Call for reinspection.
|
||||
Building Final Inspection | Issue TCO | 1/25/2021 (10:00 - 12:00) | 1/25/2021 (AM) | 01/25/2021 |
Corrections:
Miscellaneous/Other
Resolved
01/25/2021
1. Provide cane guard at drinking fountain in corridor. 2. Provide vertical grab bars in ambulatory stall. 3. Provide five exit lights as directed in field. Call for reinspection.
|
||||
Miscellaneous/Other
Carried Forward
01/25/2021
Need final electrical approval when furniture is installed. 15 day temporary occupancy approved.
|
||||
Fire Inspection Final | Passed | 1/25/2021 (10:00 - 12:00) | 1/25/2021 (AM) | 01/25/2021 |
Building Final Inspection | Passed | 02/10/2021 | ||
Corrections:
Miscellaneous/Other
Resolved
02/10/2021
Need final electrical approval when furniture is installed. 15 day temporary occupancy approved.
|