Summary

PRBD202004315
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
Remodel of the existing Smaaash space in Mall of America for a new tenant The Fair on 4th. The work consists of demolition of existing finishes, installation of new finishes, new casework, new axe throwing area, new rolling doors, and new layouts of bars and kitchen areas.
05/06/2020
06/10/2020
08/29/2021
03/02/2021

Locations

Permits

Permit Number: PRBD202004315

Building
Finaled
06/10/2020
08/29/2021

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 6/11/2020 (12:30 - 2:30) 6/11/2020 (PM) 06/11/2020
Corrections:


Miscellaneous/Other
Comment Only
06/11/2020
Ramp framing, walls and upper headers at bar areas and other free standing walls.. approved

Framing Inspection Partial Pass 08/03/2020
Corrections:


Miscellaneous/Other
Comment Only
08/03/2020
Above ceiling and framing of ceiling at bar and pizza kitchen approved. See outstanding comments for corrections and reinspection.

Miscellaneous/Other
Carried Forward
08/03/2020
Party room ceiling framing and support... Ceiling cannot be supported off the ductwork or supports for ductwork. Add supports as needed and relocate wires to the new supports. Reinspection of this needed. The reclaimed wood being used needs to be treated with a fire protection product that will give it a class “A” rating on all sides and edges of each board. Supply product info and verification of the correct application needed.

Framing Inspection Partial Pass 10/06/2020
Corrections:


Miscellaneous/Other
Resolved
10/06/2020
Party room ceiling framing and support... Ceiling cannot be supported off the ductwork or supports for ductwork. Add supports as needed and relocate wires to the new supports. Reinspection of this needed. The reclaimed wood being used needs to be treated with a fire protection product that will give it a class “A” rating on all sides and edges of each board. Supply product info and verification of the correct application needed.

Miscellaneous/Other
Comment Only
10/06/2020
Consultation with owner on inspections and potential opening of pizza prep area. Inspection of hood needed by HVAC inspector and kitchen area by EH inspector. Went through the space and exits signs and occupancy load signage is also needed for the party room. The standing ornaments the pat are in the outside dining area of space in mall common area need to be verified for a class A rating. MOA staff is aware of this and is checking on this.

Progress Inspection Passed w/ Conditions 11/06/2020
Corrections:


Miscellaneous/Other
Outstanding
11/06/2020
1) see plans, install occupancy signage as per plans. Grandstand occupancy to be figured at 7sq ft per person since there is no fixed seating. 2) mirrors in bathrooms to be lowered to 40” from floor to mirror reflective edge. 3) lower exit sign at corner of pizzeria, it is out of view and hidden by lighting. Final needed for all trades inspections, have inspections set up for finals.

Fire Inspection Final Passed w/ Conditions 11/9/2020 (12:30 - 2:30) 11/9/2020 (PM) 11/09/2020
Corrections:


Miscellaneous/Other
Comment Only
11/09/2020
Fire final approved pending installation of fire extinguishers as discussed with contractor and owner/operator. COB Building Inspector will perform final inspection of egress and exit signage.

Building Final Inspection Partial Pass 11/9/2020 (12:30 - 2:30) 11/9/2020 (PM) 11/09/2020
Corrections:


Miscellaneous/Other
Comment Only
11/09/2020
Partial pass- final is contingent on environmental and fire final

Building Final Inspection Partial Pass 11/19/2020 (8:00 - 10:00) 11/19/2020 (AM) 11/19/2020
Corrections:


Miscellaneous/Other
Comment Only
11/19/2020
Complete trap protection at bathroom sinks. Temp occupancy signage approved. Approved for temp occupancy.

Building Final Inspection Passed 03/02/2021
Corrections:


Miscellaneous/Other
Comment Only
03/02/2021
Accessibility items checked and approved. Occupancy Signage ... approved. Approved to close permit and to open to public.