PRBD202006700
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Framing Inspection | Partial Pass | 8/19/2020 (12:30 - 2:30) | 8/19/2020 (PM) | 08/19/2020 |
| Initial walk thru - A. Patch existing fireproofing on steel beams. B. 4 inch holes in concrete - fill with mineral wool, and install steel cover plate. C. Open ceiling - no ceiling tiles with clouds concept. D. Exits 3. Guide exit egress path to the 3 stairwells with even distribution. E. Wire all exit signs and EM lights to building generator circuit. F. Call for re inspection when ready. | ||||
| Building Final Inspection | Passed | 11/17/2020 (12:30 - 2:30) | 11/17/2020 (PM) | 11/17/2020 |
| Final - passed | ||||
| Fire Inspection Final | Passed | 11/17/2020 (12:30 - 2:30) | 11/17/2020 (PM) | 11/18/2020 |