Permit Application Status

PRBD202008326


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202008326
Building
Expired
THERMO KING CORPORATION
Alteration/Repair/Replace
Not Required
Office renovation of a select portion of Thermo King's office.
07/31/2020
08/20/2020
10/17/2021
04/20/2021

Locations

Permits

Permit Number: PRBD202008326

Building
Expired
08/20/2020
10/17/2021

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Progress Inspection Partial Pass 10/1/2020 (12:30 - 2:30) 10/1/2020 (PM) 10/01/2020
Corrections:


Miscellaneous/Other
Comment Only
10/01/2020
Viewed draintile system in lower level, approved to dowel slab bars and place concrete

Framing Inspection Partial Pass 10/8/2020 (8:00 - 10:00) 10/8/2020 (AM) 10/08/2020
Corrections:


Miscellaneous/Other
Comment Only
10/08/2020
Exterior wall furred framing on 2dnd floor approved... ok to spray foam, and cover.

Framing Inspection Partial Pass 10/16/2020 (12:30 - 2:30) 10/16/2020 (PM) 10/16/2020
Corrections:


Miscellaneous/Other
Comment Only
10/16/2020
Exterior wall furred framing on 1st floor and spray foam at exterior walls on 2nd. DC315 Fire protectant was sprayed at the exposed foam in the above ceiling plenum area.... approved

Framing Inspection Passed 10/21/2020 (12:30 - 2:30) 10/21/2020 (PM) 10/21/2020
Corrections:


Miscellaneous/Other
Comment Only
10/21/2020
Wall Framing west of stairway. Approved

Framing Inspection Partial Pass 11/2/2020 (8:00 - 10:00) 11/2/2020 (AM) 11/02/2020
Corrections:


Miscellaneous/Other
Comment Only
11/02/2020
First floor walls approved. Dead spaces to remain open for inspection of firestops.

Framing Inspection Partial Pass 11/13/2020 (8:00 - 10:00) 11/13/2020 (AM) 11/13/2020
Corrections:


Miscellaneous/Other
Comment Only
11/13/2020
Approved to cover soffit and chase walls, firestops also approved .

Framing Inspection Partial Pass 11/19/2020 (12:30 - 2:30) 11/19/2020 (PM) 11/19/2020
Corrections:


Miscellaneous/Other
Comment Only
11/19/2020
Wall Framing in basement approved

Fire Inspection Final Not Ready 12/1/2020 (8:00 - 10:00) 12/1/2020 (AM) 12/01/2020
Framing Inspection Partial Pass 1/5/2021 (8:00 - 10:00) 1/5/2021 (AM) 01/05/2021
Corrections:


Miscellaneous/Other
Comment Only
01/05/2021
Drift house enclosure at roof... framing and fastening to roof and supporting bar joists is as per design.

Progress Inspection Partial Pass 2/10/2021 (8:00 - 10:00) 2/10/2021 (AM) 02/10/2021
Corrections:


Miscellaneous/Other
Comment Only
02/10/2021
Ceiling framing and above ceiling for basement, first and send floors... approved

Progress Inspection Passed w/ Conditions 03/18/2021
Corrections:


Miscellaneous/Other
Comment Only
03/18/2021
Client services room being remodeled on first floor ... above ceiling and ceiling installation approved, pending corrections of the ceiling grid being supported off the ducting and its supports. Ceiling cannot be supported off the ducting or it’s supports, installer to add independent support and retire support wiring to that independent support.

Building Final Inspection Partial Pass 3/26/2021 (8:00 - 10:00) 3/26/2021 (AM) 03/26/2021
Corrections:


Miscellaneous/Other
Carried Forward
03/26/2021
1)Sac charges to be addressed. 2) install accessibility signage to bathrooms 3) sprinkler head in basement needs to be 4” from partition wall... address accordingly.

Miscellaneous/Other
Comment Only
03/26/2021
First phase inspected and approved for temp final. See outstanding comments for corrections.

Fire Inspection Final Partial Pass 3/26/2021 (8:00 - 10:00) 3/26/2021 (AM) 03/29/2021
Fire Inspection Final Passed 04/20/2021
Building Final Inspection Passed 04/20/2021
Corrections:


Miscellaneous/Other
Resolved
04/20/2021
1)Sac charges to be addressed. 2) install accessibility signage to bathrooms 3) sprinkler head in basement needs to be 4” from partition wall... address accordingly.

Miscellaneous/Other
Comment Only
04/20/2021
Accessibility completed, and partition was moved to maintain clearance for sprinkler coverage. Dampers were checked with system and with mechanical final, see associated mechanical permit for this project. Final approved for this permit and scope of work.

Miscellaneous/Other
Comment Only
04/20/2021
Accessibility completed, and partition was moved to maintain clearance for sprinkler coverage. Dampers were checked with system and with mechanical final, see associated mechanical permit for this project. Final approved for this permit and scope of work.

Miscellaneous/Other
Comment Only
04/20/2021
Accessibility completed, and partition was moved to maintain clearance for sprinkler coverage. Dampers were checked with system and with mechanical final, see associated mechanical permit for this project. Final approved for this permit and scope of work.