Permit Application Status

PRBD202011293


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202011293
Building
Finaled
MSP SOUTHPOINT EQUITIES LLC
Alteration/Repair/Replace
Not Required
Tenant Improvements
09/24/2020
10/16/2020
11/22/2021
05/26/2021

Locations

Permits

Permit Number: PRBD202011293

Building
Finaled
10/16/2020
11/22/2021

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 11/17/2020 (10:00 - 12:00) 11/17/2020 (AM) 11/17/2020
See corrections.
Corrections:


Miscellaneous/Other
Comment Only
11/17/2020
A. Wall Framing - Passed. B. Existing 1.5 hr rated Stairwell doors - Passed. C. Fiberglass Insulation on site is plenum rated - passed. D. Electrical contractor on site, And will be installing 90 minute battery back up fluorescent ceiling lighting dispersed through out ceiling per plan, for loss of power emergency exiting lighting. E. Call for above ceiling Rough in inspection for fire sprinkler and exit signs installed. Note - do not get paint on the fire sprinkler device heads. F. Fire extinguishers must be installed per fire marshal locations upon final.

Fire Inspection Final Passed 05/20/2021
Building Final Inspection Passed 5/26/2021 (10:00 - 12:00) 5/26/2021 (AM) 05/26/2021