Summary

PRBD202013425
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
SCOPE OF WORK: NEW INTERIOR NON-BEARING PARTITIONS AND CEILING FINISHES, NEW STOREFRONT, NEW MECHANICAL DUCTWORK, NEW LIGHTING, NEW ELECTRICAL WORK, NEW PLUMBING
10/29/2020
12/18/2020
06/11/2023

Locations

Permits

Permit Number: PRBD202013425

Building
Finaled
12/18/2020
06/11/2023

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Progress Inspection Partial Pass 2/10/2021 (10:00 - 12:00) 2/10/2021 (AM) 02/10/2021
Corrections:


Miscellaneous/Other
Comment Only
02/10/2021
4C units and common areas checked for the future final... approved

Progress Inspection Passed 3/25/2021 (12:30 - 2:30) 02/10/2021
Corrections:


Miscellaneous/Other
Comment Only
02/10/2021
Viewed fireproofing to structural steel located in loading dock where additional reinforcement was added for the space above....approved

Framing Inspection Partial Pass 2/24/2021 (12:30 - 2:30) 2/24/2021 (PM) 02/24/2021
Corrections:


Miscellaneous/Other
Comment Only
02/24/2021
Back of house framing and firestops in wall., and fireproofing of posts... approved pending firestop of gray PVC pipe in corner,( provide photo to inspector).

Progress Inspection Partial Pass 5/5/2021 (8:00 - 10:00) 03/29/2021
Corrections:


Miscellaneous/Other
Comment Only
03/29/2021
Fire proofing patching completed with Cafco hand patch to match existing coverage... Approved

Framing Inspection Partial Pass 5/3/2021 (8:00 - 10:00) 5/3/2021 (AM) 05/03/2021
Corrections:


Miscellaneous/Other
Comment Only
05/03/2021
Progress framing of boxed in soffit areas approved. Call for trades inspections and complete all framing prior to next inspection.

Progress Inspection Partial Pass 5/5/2021 (8:00 - 10:00) 5/5/2021 (AM) 05/05/2021
Corrections:


Miscellaneous/Other
Comment Only
05/05/2021
Ceilings in storefront approved to cover, except north and south soffits.

Framing Inspection Passed w/ Conditions 6/7/2021 (8:00 - 10:00) 6/7/2021 (AM) 06/07/2021
Corrections:


Miscellaneous/Other
Comment Only
06/07/2021
Framing of storefront, knee walls, and firestops at plumbing... approved Contractor to send pictures of firestops at elevator penetrations to inspector.

Building Final Inspection Failed 7/22/2021 7/22/2021 (AM) 07/22/2021
Corrections:


Miscellaneous/Other
Carried Forward
07/22/2021
Complete finishes and installations, clean space and removal of equipment with construction use … all is required with a final occupancy. Inspections with all trades to be completed as well. The branding group is allowed to come in and set up space as work progresses, this is part of finishing the space. Final not approved

Fire Inspection Final Failed 7/22/2021 (8:00 - 10:00) 7/22/2021 (AM) 07/23/2021
Building Final Inspection Partial Pass 7/26/2021 (8:00 - 10:00) 7/26/2021 (AM) 07/26/2021
Corrections:


Miscellaneous/Other
Resolved
07/26/2021
Complete finishes and installations, clean space and removal of equipment with construction use … all is required with a final occupancy. Inspections with all trades to be completed as well. The branding group is allowed to come in and set up space as work progresses, this is part of finishing the space. Final not approved

Miscellaneous/Other
Comment Only
07/26/2021
Approval to stock, setup, and decorate space. No opening to public yet, complete work and all trades inspections, environmental health requirements as well for final inspection.

EH Progress Inspection Passed w/ Conditions 5/13/2021 (Morning) 08/11/2021
Building Final Inspection Passed 12/13/2022