PRBD202013613
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Building Final Inspection | Passed | 11/20/2020 (12:30 - 2:30) | 11/20/2020 (PM) | 11/20/2020 |
Corrections:
Miscellaneous/Other
Comment Only
11/20/2020
Temp Structure is built, the pathway to the testing site is clearly marked and all routes as as per the ramp drive signage. There are exhausting fans and CO detection in the ramp at the location of the structure, the fan for the structure is not yet installed, but will be by Monday. CO detector for the structure will be in place as well. One door is installed for exiting, this will be sufficient for the number of persons allowed with testing. The Electric contractor is installing the exit sign over the service door at time of inspection. All other exiting is compliant as for this ramp.
Building final for this permit approved, pending inspection of electrical on Monday 11/23/20
|
||||
Fire Inspection Final | Passed | 11/20/2020 (12:30 - 2:30) | 11/20/2020 (PM) | 11/25/2020 |