Permit Application Status

PRBD202013783


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRBD202013783
Building
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Not Required
Tenant space build-out for retail store inside the mall.
11/05/2020
11/30/2020
09/01/2021
03/05/2021

Locations

Permits

Permit Number: PRBD202013783

Building
Finaled
11/30/2020
09/01/2021

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 12/11/2020 (8:00 - 10:00) 12/11/2020 (AM) 12/11/2020
Corrections:


Miscellaneous/Other
Comment Only
12/11/2020
This was a consultation visit to go over requirements with this buildout. Plans show Storefront with wood attached to framing...Storefront wall has to be built of steel stud framing and encapsulated on both sides with gypsum before any wood can be attached to the wall. Went over firestops and rated assembly’s that also need to be patched in. Call for inspection when ready and trades have had their inspections.

Framing Inspection Partial Pass 12/23/2020 (10:00 - 12:00) 12/23/2020 (AM) 12/23/2020
Corrections:


Miscellaneous/Other
Comment Only
12/23/2020
This inspection was to go over the store front detail as per the plan submitted. A chance had to be made due to the requirements of the mall. The plywood is now located outside the wall with gypsum behind it. This was approved by the design team so they could proceed with the framing and move forward with new finish dimensions for the exterior covering.

Framing Inspection Partial Pass 1/11/2021 (8:00 - 10:00) 1/11/2021 (AM) 01/11/2021
Corrections:


Miscellaneous/Other
Comment Only
01/11/2021
Walls and ceilings, framing. Approved pending adding a stiff back and kicker to brace wall at hallway where studs are over notched. This inspection does not include the storefront and the small section of ceiling that ties into front.

Framing Inspection Partial Pass 1/22/2021 (8:00 - 10:00) 1/22/2021 (AM) 01/22/2021
Corrections:


Miscellaneous/Other
Comment Only
01/22/2021
Storefront wall and ceiling framing , not including the roll up door opening ... approved , ok to cover.

Framing Inspection Partial Pass 01/29/2021
Corrections:


Miscellaneous/Other
Comment Only
01/29/2021
Platform framing and gypsum encasement at storefront of display area... approved.

Framing Inspection Passed 3/1/2021 (8:00 - 10:00) 3/1/2021 (AM) 03/01/2021
Corrections:


Miscellaneous/Other
Comment Only
03/01/2021
Front rating at coiling door and the catwalk for the motor servicing approved.

Fire Inspection Final Passed 3/4/2021 (10:00 - 12:00) 3/4/2021 (AM) 03/04/2021
Building Final Inspection Partial Pass 3/4/2021 (10:00 - 12:00) 3/4/2021 (AM) 03/04/2021
Corrections:


Miscellaneous/Other
Carried Forward
03/04/2021
Complete the firestops at through penetrations at the inside portion of rated wall in storeroom. Call in for inspection of this for the full final.

Miscellaneous/Other
Comment Only
03/04/2021
Approved for a temp final, with approval to stock and setup space. Accessibility is compliant within this space. See outstanding comments for corrections and reinspection.

Building Final Inspection Passed 3/5/2021 (12:30 - 2:30) 3/5/2021 (PM) 03/05/2021
Corrections:


Miscellaneous/Other
Resolved
03/05/2021
Complete the firestops at through penetrations at the inside portion of rated wall in storeroom. Call in for inspection of this for the full final.

Miscellaneous/Other
Comment Only
03/05/2021
Final approved for this Building permit, corrections completed.