PRBD202014872
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Framing Inspection | Passed | 12/23/2020 (12:30 - 2:30) | 12/23/2020 (PM) | 12/23/2020 |
Corrections:
Miscellaneous/Other
Comment Only
12/23/2020
Wall framing approved.
|
||||
Progress Inspection | Passed w/ Conditions | 01/27/2021 | ||
Corrections:
Miscellaneous/Other
Comment Only
01/27/2021
Contractor had the tenants of this space move in due to timeline constraints. Space is completed, though final inspections were not all performed.
The tip up concrete wall panels had a 14’x14’ opening cut in by FabCon Inc. The panels have been tied together above door opening. See photos photos taken for Fab Con’s fix to accommodate the opening. Work was done by FabCon, as contractor verified.
Contractor to set up final inspections as to all permits associated with this project.
|
||||
Fire Inspection Final | Passed | 04/01/2021 | ||
Building Final Inspection | Passed | 04/01/2021 | ||
Corrections:
Miscellaneous/Other
Comment Only
04/01/2021
Building final approved
|